blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3232723

EP3232723 - SYNCHRONIZED UPLINK-DOWNLINK HOP FOR MEASUREMENTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  23.10.2020
FormerGrant of patent is intended
Status updated on  23.06.2020
FormerExamination is in progress
Status updated on  14.08.2019
FormerRequest for examination was made
Status updated on  15.09.2017
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): HU
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2020/48]
Former [2017/42]For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
Inventor(s)01 / GAAL, Peter
c/o QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
02 / BARBIERI, Alan
c/o Qualcomm Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
 [2017/42]
Representative(s)Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2020/48]
Former [2017/42]Wegner, Hans
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
Application number, filing date17174157.228.06.2012
[2017/42]
Priority number, dateUS201161504083P01.07.2011         Original published format: US 201161504083 P
US20121353496227.06.2012         Original published format: US201213534962
[2017/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3232723
Date:18.10.2017
Language:EN
[2017/42]
Type: B1 Patent specification 
No.:EP3232723
Date:25.11.2020
Language:EN
[2020/48]
Search report(s)(Supplementary) European search report - dispatched on:EP18.09.2017
ClassificationIPC:H04W72/08, // H04W72/02, H04W88/08, H04W28/04, H04W16/14
[2020/26]
CPC:
H04W72/541 (EP,US); H04W16/14 (EP,US); H04W28/04 (EP,US);
H04W72/02 (EP,US); H04W72/542 (EP,US); H04W88/08 (EP,US)
Former IPC [2017/42]H04W72/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/42]
TitleGerman:SYNCHRONISIERTER UPLINK-DOWNLINK-SPRUNG FÜR MESSUNGEN[2017/42]
English:SYNCHRONIZED UPLINK-DOWNLINK HOP FOR MEASUREMENTS[2017/42]
French:SAUT SYNCHRONISÉ DE LIAISON MONTANTE ET DE LIAISON DESCENDANTE POUR DES MESURES[2017/42]
Examination procedure02.06.2017Examination requested  [2017/42]
02.06.2017Date on which the examining division has become responsible
17.04.2018Amendment by applicant (claims and/or description)
20.08.2019Despatch of a communication from the examining division (Time limit: M04)
19.12.2019Reply to a communication from the examining division
24.06.2020Communication of intention to grant the patent
20.10.2020Fee for grant paid
20.10.2020Fee for publishing/printing paid
20.10.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP12735990.9  / EP2727428
Opposition(s)26.08.2021No opposition filed within time limit [2021/44]
Fees paidRenewal fee
02.06.2017Renewal fee patent year 03
02.06.2017Renewal fee patent year 04
02.06.2017Renewal fee patent year 05
02.06.2017Renewal fee patent year 06
08.06.2018Renewal fee patent year 07
10.06.2019Renewal fee patent year 08
31.03.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.06.2012
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
IE28.06.2021
LU28.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
[2023/29]
Former [2023/24]AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
IE28.06.2021
LU28.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/34]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
IE28.06.2021
LU28.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/23]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
IE28.06.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/21]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
IE28.06.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/18]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
LU28.06.2021
Former [2022/10]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2022/08]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/50]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/48]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/46]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/45]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/37]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/36]AT25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/35]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/34]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/33]AT25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/32]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/28]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/25]AT25.11.2020
FI25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/23]AT25.11.2020
FI25.11.2020
LV25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/22]FI25.11.2020
RS25.11.2020
NO25.02.2021
PT25.03.2021
Former [2021/21]FI25.11.2020
PT25.03.2021
Former [2021/20]FI25.11.2020
Documents cited:Search[Y]WO9602979  (ERICSSON TELEFON AB L M [SE], et al) [Y] 1-6 * page 1, line 5 - line 10 * * page 6, line 29 - page 7, line 19 * * page 12, line 6 - page 15, line 3 * * page 20, line 4 - line 11 * * figures 3, 4 *;
 [Y]WO03094395  (NOKIA CORP [FI], et al) [Y] 1-6 * page 1, line 7 - line 8 * * page 4, line 17 - line 23 * * page 7, line 8 - line 14 * * page 19, line 1 - line 10 * * page 19, line 21 - page 20, line 16 * * page 22, line 23 - page 23, line 21 * * figures 2, 7 *;
 [A]WO2010088586  (QUALCOMM INC [US], et al) [A] 1-6 * paragraphs [0002] , [0030] , [0033] * * paragraph [0038] - paragraph [0040] * * paragraph [0045] - paragraph [0046] * * paragraphs [0049] , [0051] * * paragraph [0061] - paragraph [0062] * * figures 3, 4, 8 *;
 [A]WO2010111150  (QUALCOMM INC [US], et al) [A] 1-6 * paragraph [0002] - paragraph [0003] * * paragraph [0060] * * paragraph [0159] - paragraph [0161] * * paragraph [0169] - paragraph [0173] * * paragraph [0184] - paragraph [0189] ** figures 24, 25 *;
 [Y]US2010322185  (PARK KENNETH J [US], et al) [Y] 1-6 * paragraph [0001] * * paragraph [0039] - paragraph [0040] * * paragraphs [0051] , [0054] , [0058] * * paragraph [0062] - paragraph [0065] * * paragraph [0073] * * paragraph [0129] - paragraph [0132] * * figures 1, 3, 29 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.