blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3309078

EP3309078 - AIRCRAFT NACELLE COMPRISING A CONNECTION BETWEEN AN AIR INTAKE DUCT AND AN ENGINE DUCT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.04.2020
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  03.05.2019
FormerGrant of patent is intended
Status updated on  04.03.2019
FormerRequest for examination was made
Status updated on  12.10.2018
FormerThe application has been published
Status updated on  22.03.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Airbus Operations SAS
316, route de Bayonne
31060 Toulouse / FR
[2018/16]
Inventor(s)01 / PORTE, Alain
8, allée de Belle-Ile
31770 COLOMIERS / FR
02 / VINCHES, Frédéric
Boîte Postale 31330
10, impasse le Clos du Château
LARRA / FR
 [2018/16]
Representative(s)Fantin, Laurent
ALLICI
Gare de Bordeaux Saint-Jean
Pavillon Nord - Parvis Louis Armand
CS 21912
33082 Bordeaux Cedex / FR
[2018/16]
Application number, filing date17194690.804.10.2017
[2018/16]
Priority number, dateFR2016005989913.10.2016         Original published format: FR 1659899
[2018/16]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3309078
Date:18.04.2018
Language:FR
[2018/16]
Type: B1 Patent specification 
No.:EP3309078
Date:05.06.2019
Language:FR
[2019/23]
Search report(s)(Supplementary) European search report - dispatched on:EP19.03.2018
ClassificationIPC:B64D33/02
[2018/16]
CPC:
B64D29/06 (EP); B64D33/02 (EP,CN); B64D29/02 (CN);
B64D2033/0206 (EP,CN); B64D2033/0286 (EP,CN)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/46]
Former [2018/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LUFTFAHRZEUGGONDEL, DIE EINE VERBINDUNG ZWISCHEN EINER LUFTLEITUNG UND EINER MOTORISIERUNGSLEITUNG UMFASST[2018/16]
English:AIRCRAFT NACELLE COMPRISING A CONNECTION BETWEEN AN AIR INTAKE DUCT AND AN ENGINE DUCT[2018/16]
French:NACELLE D'AERONEF COMPRENANT UNE LIAISON ENTRE UN CONDUIT D'UNE ENTREE D'AIR ET UN CONDUIT D'UNE MOTORISATION[2018/16]
Examination procedure08.10.2018Amendment by applicant (claims and/or description)
08.10.2018Examination requested  [2018/46]
08.10.2018Date on which the examining division has become responsible
05.03.2019Communication of intention to grant the patent
24.04.2019Fee for grant paid
24.04.2019Fee for publishing/printing paid
24.04.2019Receipt of the translation of the claim(s)
Opposition(s)06.03.2020No opposition filed within time limit [2020/20]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.10.2017
AL05.06.2019
AT05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MK05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE04.10.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
BE31.10.2019
[2022/32]
Former [2021/34]HU04.10.2017
AL05.06.2019
AT05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE04.10.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
BE31.10.2019
Former [2021/32]HU04.10.2017
AL05.06.2019
AT05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE04.10.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
BE31.10.2019
Former [2021/26]AL05.06.2019
AT05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE04.10.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
BE31.10.2019
Former [2020/46]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE04.10.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
BE31.10.2019
Former [2020/38]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
BE31.10.2019
Former [2020/35]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
LU04.10.2019
IS05.10.2019
PT07.10.2019
Former [2020/29]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/25]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/22]AL05.06.2019
AT05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/17]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/13]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/12]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/11]AL05.06.2019
AT05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/10]AL05.06.2019
AT05.06.2019
CZ05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/09]AL05.06.2019
CZ05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2020/07]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/51]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/50]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
NO05.09.2019
GR06.09.2019
Former [2019/49]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/48]ES05.06.2019
FI05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/47]ES05.06.2019
FI05.06.2019
LT05.06.2019
NO05.09.2019
Documents cited:Search[XAY]EP0057621  (SNECMA [FR]) [X] 1 * page 1, line 5 - line 12 * * page 5, line 22 - page 6, line 10 * * figures 1,2 * [A] 2-9 [Y] 1;
 [Y]FR2926789  (AIRCELLE SA [FR]) [Y] 1 * page 4, line 23 - page 5, line 14 * * page 5, line 34 - page 6, line 4 * * page 6, line 22 - line 28 ** page n; figure 9 *;
 [Y]EP2241504  (ROHR INC [US]) [Y] 1 * paragraphs [0029] , [0030] * * figures 2,3 *;
 [Y]FR2954282  (AIRBUS OPERATIONS SAS [FR]) [Y] 1 * page 4, line 23 - page 5, line 21 * * page 6, line 19 - line 26 * * figures 4-6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.