EP3342656 - VEHICLE BRAKE SYSTEM AND METHOD FOR OPERATING A VEHICLE BRAKE SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 12.05.2020 | ||
Former | Examination is in progress Status updated on 17.04.2019 | ||
Former | Request for examination was made Status updated on 18.01.2019 | ||
Former | The application has been published Status updated on 01.06.2018 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE, MK | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2018/27] | For all designated states Robert Bosch GmbH P.O. Box 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
Zhou, Wenguang 45010 Dunbarton Drive Novi, MI 48375 / US | 02 /
Foitzik, Bertram Ilsfelder Str. 28/1 74360 Ilsfeld / DE | 03 /
Wu, Kevin 43011 Brookstone Drive Novi, MI 48377 / US | [2018/27] | Representative(s) | (deleted) | [2020/40] | Application number, filing date | 17202784.9 | 21.11.2017 | [2018/27] | Priority number, date | US201615391403 | 27.12.2016 Original published format: US201615391403 | [2018/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3342656 | Date: | 04.07.2018 | Language: | EN | [2018/27] | Type: | B1 Patent specification | No.: | EP3342656 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.04.2018 | Classification | IPC: | B60T17/22, B60T13/66, B60T8/00, B60T13/14, B60T13/74, // B60T7/04, B60T8/40, B60T11/16, B60T13/68 | [2020/21] | CPC: |
B60T13/745 (EP,KR,US);
B60T13/146 (EP,US);
B60T13/662 (EP,US);
B60T13/686 (EP,KR,US);
B60T17/221 (EP,US);
B60T7/042 (EP,KR,US);
B60T8/00 (US);
B60T8/4081 (EP,KR,US);
B60T11/16 (EP,US);
B60T2220/04 (KR);
B60T2270/404 (EP,US);
B60T2270/82 (EP,US);
|
Former IPC [2018/27] | B60T17/22, B60T13/66, // B60T7/04, B60T8/40, B60T11/16, B60T13/68 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/08] |
Former [2018/27] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FAHRZEUGBREMSSYSTEM UND VERFAHREN ZUM BETREIBEN EINES FAHRZEUGBREMSSYSTEMS | [2018/27] | English: | VEHICLE BRAKE SYSTEM AND METHOD FOR OPERATING A VEHICLE BRAKE SYSTEM | [2018/27] | French: | SYSTÈME DE FREINAGE DE VÉHICULE ET PROCÉDÉ DE FONCTIONNEMENT D'UN SYSTÈME DE FREINAGE DE VÉHICULE | [2018/27] | Examination procedure | 02.01.2019 | Amendment by applicant (claims and/or description) | 04.01.2019 | Examination requested [2019/08] | 04.01.2019 | Date on which the examining division has become responsible | 24.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 08.08.2019 | Reply to a communication from the examining division | 13.05.2020 | Communication of intention to grant the patent | 25.08.2020 | Fee for grant paid | 25.08.2020 | Fee for publishing/printing paid | 25.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 02.12.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.11.2017 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | MT | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | TR | 30.09.2020 | IE | 21.11.2020 | LU | 21.11.2020 | BE | 30.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | [2022/33] |
Former [2022/27] | HU | 21.11.2017 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MT | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
TR | 30.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/46] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/33] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
LU | 21.11.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/31] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/23] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Documents cited: | Search | [A]GB2349676 (LUCAS IND PLC [GB]) [A] 1-20* the whole document *; | [XI]US2004100146 (GIERS BERNHARD [DE], et al) [X] 1,2,4-19 * figures 1,2 * * paragraph [0001] * * paragraph [0009] * * paragraph [0011] * * paragraph [0018] - paragraph [0019] * * paragraph [0022] * * paragraph [0024] * [I] 3,20; | [XI]CN1757551 (TOYOTA MOTOR CO LTD [JP]) [X] 1,2,4-13,15-19 * figures 1,19,22 * * page 42, line 22 - line 28 * * page 50, line 14 - line 19 * [I] 3,14,20; | [XI]WO2011105405 (HONDA MOTOR CO LTD [JP], et al) [X] 1-8,10-15,17-19 * figures 2,5 * * paragraph [0001] * * paragraph [0035] * * paragraph [0046] - paragraph [0048] * [I] 20; | [A]WO2014135370 (CONTINENTAL TEVES AG & CO OHG [DE]) [A] 1-20 * the whole document *; | [A]US2015035353 (DRUMM STEFAN A [DE]) [A] 3 * figures 1,2 * |