blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3330171

EP3330171 - APPARATUS FOR PREDICTING A POWER CONSUMPTION OF A MARITIME VESSEL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  30.03.2020
FormerExamination is in progress
Status updated on  25.01.2019
FormerRequest for examination was made
Status updated on  07.12.2018
FormerThe application has been published
Status updated on  04.05.2018
Most recent event   Tooltip16.06.2023Lapse of the patent in a contracting state
New state(s): NL
published on 19.07.2023  [2023/29]
Applicant(s)For all designated states
Offshore Navigation Limited
201 Rogers Office Building
Edwin Wallace Rey Drive
2640 George Hill / AI
[2018/23]
Inventor(s)01 / DOKKEN, Sverre
Nicou Pattichi 26
3071 Limassol / CY
02 / MAO, Wengang
Chalmers University of Technology
412 96 Gothenburg / SE
03 / ANAGNOSTOPOULOS, Alexis
G.M.S. Global Maritime Services Ltd.
12 Hibel Road
Macclesfield, Cheshire SK10 2AB / GB
 [2020/17]
Former [2018/23]01 / DOKKEN, Sverre
Nicou Pattichi 26
3071 Limassol / CY
02 / MAO, Wengang
c/o Chalmers University of Technology
SE-412 96 Gothenburg / SE
03 / ANAGNOSTOPOULOS, Alexis
c/o G.M.S. Global Maritime Services Ltd.
12 Hibel Road, Macclesfield
Cheshire, SK10 2AB / GB
Representative(s)Patentship Patentanwaltsgesellschaft mbH
Paul-Gerhardt-Allee 50
81245 München / DE
[N/P]
Former [2018/23]Patentship Patentanwaltsgesellschaft mbH
Elsenheimerstraße 65
80687 München / DE
Application number, filing date17204814.230.11.2017
[2018/23]
Priority number, dateEP2016020157230.11.2016         Original published format: EP 16201572
[2018/23]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3330171
Date:06.06.2018
Language:EN
[2018/23]
Type: A3 Search report 
No.:EP3330171
Date:08.08.2018
Language:EN
[2018/32]
Type: B1 Patent specification 
No.:EP3330171
Date:09.09.2020
Language:EN
[2020/37]
Search report(s)(Supplementary) European search report - dispatched on:EP09.07.2018
ClassificationIPC:G01C21/20, B63B49/00, G01W1/10, G01W1/00
[2020/07]
CPC:
G01C21/203 (EP); B63B49/00 (EP); G01W1/10 (EP);
G01W2001/006 (EP); G06N20/00 (EP); Y02T70/10 (EP)
Former IPC [2018/30]B63B49/00, B63B9/00, G01C21/20, G01W1/00, G01W1/10
Former IPC [2018/23]B63B49/00, B63B9/00, G01C21/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/02]
Former [2018/23]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VORRICHTUNG ZUR VORHERSAGE DES STROMVERBRAUCHS EINES SEESCHIFFES[2018/23]
English:APPARATUS FOR PREDICTING A POWER CONSUMPTION OF A MARITIME VESSEL[2018/23]
French:APPAREIL PERMETTANT DE PRÉDIRE UNE CONSOMMATION D'ÉNERGIE D'UN VAISSEAU MARITIME[2018/23]
Examination procedure03.12.2018Amendment by applicant (claims and/or description)
03.12.2018Examination requested  [2019/02]
03.12.2018Date on which the examining division has become responsible
28.01.2019Despatch of a communication from the examining division (Time limit: M04)
15.05.2019Reply to a communication from the examining division
04.12.2019Cancellation of oral proceeding that was planned for 12.12.2019
12.12.2019Date of oral proceedings (cancelled)
31.03.2020Communication of intention to grant the patent
31.07.2020Fee for grant paid
31.07.2020Fee for publishing/printing paid
31.07.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20194982.3  / EP3825651
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Fees paidRenewal fee
21.11.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.11.2017
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
NL23.09.2020
BE30.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
[2023/29]
Former [2022/33]HU30.11.2017
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
BE30.11.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2022/27]HU30.11.2017
AL09.09.2020
AT09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MT09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/48]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/46]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
CH30.11.2020
IE30.11.2020
LI30.11.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
AT09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
CH30.11.2020
LI30.11.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/33]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SK09.09.2020
SM09.09.2020
LU30.11.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/31]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
AT09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SM09.09.2020
BG09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/23]AT09.09.2020
CZ09.09.2020
EE09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SM09.09.2020
BG09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SM09.09.2020
BG09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
BG09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
BG09.12.2020
GR10.12.2020
Former [2021/07]LT09.09.2020
Documents cited:Search[XI]US2015149074  (LEPISTÖ MIKKO [FI], et al) [X] 1,13,15 * paragraphs [0005] , [0022] - [0024] - [0029] - [0030] - [0033] - [0034] - [0041] , [0047] , [0063] - [0068] * [I] 6-12,14;
 [XA]US2016251064  (ISHIOKA MASAHITO [JP], et al) [X] 1-5,12,13,15 * paragraphs [0030] , [0031] , [0 32] , [0033] , [0035] , [0036] , [0 56] - [0060] - [0062] , [0063] , [0071] , [0072]; figure 2 * [A] 6-11,14;
 [A]  - "Training, test, and validation sets", (20161129), Wikipedia, URL: https://en.wikipedia.org/w/index.php?title=Training,_test,_and_validation_sets&oldid=752127502, (20180618), XP002782141 [A] 1-15 * the whole document *
 [A]  - "Regression analysis", (20161128), Wikipedia, URL: https://en.wikipedia.org/w/index.php?title=Regression_analysis&oldid=751970896, (20180618), XP002782142 [A] 1-15 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.