| EP3468930 - FRICTION MATERIAL [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 28.04.2023 Database last updated on 28.03.2026 | |
| Former | Grant of patent is intended Status updated on 21.12.2022 | ||
| Former | Examination is in progress Status updated on 26.05.2020 | ||
| Former | Request for examination was made Status updated on 15.03.2019 | ||
| Former | The international publication has been made Status updated on 16.12.2017 | ||
| Former | unknown Status updated on 16.06.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states ROCKWOOL A/S Hovedgaden 584 2640 Hedehusene / DK | [2022/52] |
| Former [2019/16] | For all designated states Rockwool International A/S Hovedgaden 584 2640 Hedehusene / DK | Inventor(s) | 01 /
PERSOON, Fernao Joseph Cornelis P.O. Box 1160 NL-6040 KD Roermond / NL | 02 /
HEBBEN, Roel Mathijs Johannes P.O. Box 1160 NL-6040 KD Roermond / NL | 03 /
SANTAMARIA RAZO, Diego Adolfo Piuslaan 159 5643 PB Eindhoven / NL | [2019/16] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/16] | Application number, filing date | 17728570.7 | 09.06.2017 | [2019/16] | WO2017EP64128 | Priority number, date | EP20160174074 | 10.06.2016 Original published format: EP 16174074 | [2019/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017212029 | Date: | 14.12.2017 | Language: | EN | [2017/50] | Type: | A1 Application with search report | No.: | EP3468930 | Date: | 17.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.12.2017 takes the place of the publication of the European patent application. | [2019/16] | Type: | B1 Patent specification | No.: | EP3468930 | Date: | 31.05.2023 | Language: | EN | [2023/22] | Search report(s) | International search report - published on: | EP | 14.12.2017 | Classification | IPC: | C03C3/097, C03C13/00, F16D69/02, C03C3/062 | [2022/50] | CPC: |
C03C13/00 (EP,KR,US);
F16D69/028 (US);
C03C3/062 (EP,KR,US);
C03C3/097 (EP,KR,US);
F16D65/092 (US);
F16D69/026 (EP,KR,US);
F16D2200/0065 (EP,KR,US);
F16D2200/0069 (EP,KR,US);
F16D2200/0073 (US);
|
| Former IPC [2019/16] | C03C13/00, C08K7/04, F16D69/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | REIBUNGSMATERIAL | [2019/16] | English: | FRICTION MATERIAL | [2019/16] | French: | MATERIAU A FRICTION | [2022/50] |
| Former [2019/16] | MATÉRIAU DE FRICTION | Entry into regional phase | 13.11.2018 | National basic fee paid | 13.11.2018 | Designation fee(s) paid | 13.11.2018 | Examination fee paid | Examination procedure | 13.11.2018 | Examination requested [2019/16] | 13.11.2018 | Date on which the examining division has become responsible | 05.08.2019 | Amendment by applicant (claims and/or description) | 29.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 08.12.2020 | Reply to a communication from the examining division | 31.03.2021 | Despatch of a communication from the examining division (Time limit: M06) | 23.09.2021 | Reply to a communication from the examining division | 26.01.2022 | Despatch of a communication from the examining division (Time limit: M06) | 18.07.2022 | Reply to a communication from the examining division | 22.12.2022 | Communication of intention to grant the patent | 17.04.2023 | Fee for grant paid | 17.04.2023 | Fee for publishing/printing paid | 17.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
29.02.2024
01.03.2024
ADMISSIBLE VRI-PATENT MONITORING ASSOCIATION Robert-Perthel-Str. 49 50739 Köln / DE Opponent's representative Ipsilon Luxembourg Ipsilon Luxembourg S.A. 76, rue de Merl 2146 Luxembourg / LU | [N/P] |
| Former [2024/15] | |||
| Opponent(s) | 01
29.02.2024
01.03.2024
ADMISSIBLE VRI-PATENT MONITORING ASSOCIATION Robert-Perthel-Str. 49 50739 Köln / DE Opponent's representative Lecomte & Partners 76-78, rue de Merl 2146 Luxembourg / LU | ||
| Former [2024/14] | |||
| Opponent(s) | 01
29.02.2024
VRI-PATENT MONITORING ASSOCIATION Robert-Perthel-Str. 49 50739 Köln / DE Opponent's representative Lecomte & Partners 76-78, rue de Merl 2146 Luxembourg / LU | 15.03.2024 | Invitation to proprietor to file observations on the notice of opposition | 15.07.2024 | Reply of patent proprietor to notice(s) of opposition | 08.05.2025 | Cancellation of oral proceeding that was planned for 08.07.2025 | 19.05.2025 | Despatch of a communication from the opposition division (Time limit: M02) | 08.07.2025 | Date of oral proceedings | 18.07.2025 | Reply to a communication from the opposition division | 08.10.2025 | Despatch of a communication from the opposition division (Time limit: M02) | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 29.06.2020 | Renewal fee patent year 04 | 28.06.2021 | Renewal fee patent year 05 | 27.06.2022 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 09.06.2017 | HU | 09.06.2017 | AT | 31.05.2023 | BG | 31.05.2023 | CZ | 31.05.2023 | DK | 31.05.2023 | EE | 31.05.2023 | ES | 31.05.2023 | FI | 31.05.2023 | HR | 31.05.2023 | IT | 31.05.2023 | LT | 31.05.2023 | LV | 31.05.2023 | MC | 31.05.2023 | NL | 31.05.2023 | PL | 31.05.2023 | RO | 31.05.2023 | RS | 31.05.2023 | SE | 31.05.2023 | SI | 31.05.2023 | SK | 31.05.2023 | SM | 31.05.2023 | TR | 31.05.2023 | IE | 09.06.2023 | LU | 09.06.2023 | BE | 30.06.2023 | CH | 30.06.2023 | NO | 31.08.2023 | GR | 01.09.2023 | IS | 30.09.2023 | PT | 02.10.2023 | [2026/04] |
| Former [2025/39] | CY | 09.06.2017 | |
| HU | 09.06.2017 | ||
| AT | 31.05.2023 | ||
| BG | 31.05.2023 | ||
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 09.06.2023 | ||
| LU | 09.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2025/36] | CY | 09.06.2017 | |
| AT | 31.05.2023 | ||
| BG | 31.05.2023 | ||
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 09.06.2023 | ||
| LU | 09.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/51] | AT | 31.05.2023 | |
| BG | 31.05.2023 | ||
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 09.06.2023 | ||
| LU | 09.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/26] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| IT | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 09.06.2023 | ||
| LU | 09.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/24] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SI | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 09.06.2023 | ||
| LU | 09.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/21] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| IE | 09.06.2023 | ||
| LU | 09.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/15] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| LU | 09.06.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/14] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| MC | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/10] | AT | 31.05.2023 | |
| CZ | 31.05.2023 | ||
| DK | 31.05.2023 | ||
| EE | 31.05.2023 | ||
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RO | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| PT | 02.10.2023 | ||
| Former [2024/08] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| SK | 31.05.2023 | ||
| SM | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2024/03] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| FI | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2024/01] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| LT | 31.05.2023 | ||
| LV | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/52] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| NL | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/51] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| HR | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| RS | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/50] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| PL | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| GR | 01.09.2023 | ||
| IS | 30.09.2023 | ||
| Former [2023/48] | AT | 31.05.2023 | |
| ES | 31.05.2023 | ||
| SE | 31.05.2023 | ||
| NO | 31.08.2023 | ||
| Former [2023/46] | ES | 31.05.2023 | Cited in | International search | [XI] WO2012085211 | [A] US2013228403 (KIKUDOME TAKASHI et al.) | [A] WO2015041241 (AKEBONO BRAKE IND et al.) | Examination | EP2380857 | by applicant | WO2011042533 | WO2011131761 | EP2016056172 | US4994506 | LUC SMEETS; MARK SEGEREN: "Improved Performance of NAO/Non-Steel Disc Pads By Usage Extreme Low Shot (ELS) Roxui@1000 Fibres", SAE BRAKE COLLOQUIUM, 2007 | HAMEED, R.; TURATSINZE, A.; DUPRAT, F.; SELLIER, A.: "Metallic fiber reinforced concrete: effect of fiber aspect ratio on the flexural properties", ARPN JOURNAL OF ENGINEERING AND APPLIED SCIENCE, vol. 4, no. 5, 2009 | Opposition | US2015204403 | WO2015011439 | EP2380857 | WO2011131761 |