| EP3528989 - HOB PEELING TOOL AND METHOD FOR HARD-FINE MACHINING OF PRE-TOOTHED WORKPIECES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 23.10.2020 | ||
| Former | Grant of patent is intended Status updated on 22.06.2020 | ||
| Former | Request for examination was made Status updated on 02.06.2020 | ||
| Former | Grant of patent is intended Status updated on 14.05.2020 | ||
| Former | Request for examination was made Status updated on 26.07.2019 | ||
| Former | The international publication has been made Status updated on 28.04.2018 | ||
| Former | unknown Status updated on 17.10.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Reishauer AG Industriestrasse 36 8304 Wallisellen / CH | [2019/35] | Inventor(s) | 01 /
HÄNNI, Florian Zürichstrasse 14 8600 Dübendorf / CH | 02 /
HAUFE, Frank Hinterbergstrasse 18 8604 Volketswil / CH | 03 /
KIRSCH, Roger Hermann-Löns-Weg 36 76307 Karlsbad / DE | 04 /
MARX, Hartmut Frohheimstrasse 1 8304 Wallisellen / CH | [2019/39] |
| Former [2019/35] | 01 /
HÄNNI, Florian Seidenstrasse 30 8304 Wallisellen / CH | ||
| 02 /
HAUFE, Frank Hinterbergstrasse 18 8604 Volketswil / CH | |||
| 03 /
KIRSCH, Roger Hermann-Löns-Weg 36 76307 Karlsbad / DE | |||
| 04 /
MARX, Hartmut Schärfligraben 36 8304 Wallisellen / CH | Representative(s) | Detken, Andreas Isler & Pedrazzini AG Giesshübelstrasse 45 Postfach 1772 8027 Zürich / CH | [2019/35] | Application number, filing date | 17780435.8 | 10.10.2017 | [2019/35] | WO2017EP75792 | Priority number, date | CH20160001412 | 21.10.2016 Original published format: CH 14122016 | [2019/35] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018073047 | Date: | 26.04.2018 | Language: | DE | [2018/17] | Type: | A1 Application with search report | No.: | EP3528989 | Date: | 28.08.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application. | [2019/35] | Type: | B1 Patent specification | No.: | EP3528989 | Date: | 25.11.2020 | Language: | DE | [2020/48] | Search report(s) | International search report - published on: | EP | 26.04.2018 | Classification | IPC: | B23F5/16, B23F21/10, B23F21/06 | [2019/35] | CPC: |
B23F5/163 (EP,CH,KR,US);
B23F21/063 (EP,CH,KR,US);
B23C5/202 (EP,CH,KR,US);
B23C5/205 (KR);
B23F21/06 (US);
B23F21/103 (EP,CH,KR,US);
B23C2200/0416 (EP,KR,US);
B23C2200/206 (EP,KR,US);
B23C2200/366 (EP,KR,US);
B23C2210/445 (EP,KR,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | WÄLZSCHÄLWERKZEUG UND VERFAHREN FÜR DIE HARTFEINBEARBEITUNG VORVERZAHNTER WERKSTÜCKE | [2019/35] | English: | HOB PEELING TOOL AND METHOD FOR HARD-FINE MACHINING OF PRE-TOOTHED WORKPIECES | [2019/35] | French: | OUTIL DE TAILLAGE EN DÉVELOPPANTE ET PROCÉDÉ POUR L'USINAGE HAUTE PRÉCISION DE MATÉRIAUX DURS DE PIÈCES PRÉ-DENTÉES | [2019/35] | Entry into regional phase | 21.03.2019 | National basic fee paid | 21.03.2019 | Designation fee(s) paid | 21.03.2019 | Examination fee paid | Examination procedure | 21.03.2019 | Examination requested [2019/35] | 21.03.2019 | Date on which the examining division has become responsible | 28.11.2019 | Amendment by applicant (claims and/or description) | 15.05.2020 | Communication of intention to grant the patent | 29.05.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 23.06.2020 | Communication of intention to grant the patent | 20.10.2020 | Fee for grant paid | 20.10.2020 | Fee for publishing/printing paid | 20.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 11.10.2019 | Renewal fee patent year 03 | 12.10.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.10.2017 | AL | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | MT | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | TR | 25.11.2020 | BG | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | [2026/04] |
| Former [2024/42] | HU | 10.10.2017 | |
| AL | 25.11.2020 | ||
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| MK | 25.11.2020 | ||
| MT | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2024/23] | HU | 10.10.2017 | |
| AL | 25.11.2020 | ||
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| MK | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2023/33] | HU | 10.10.2017 | |
| AL | 25.11.2020 | ||
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2023/30] | AL | 25.11.2020 | |
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/33] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/23] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/10] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/08] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/50] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/46] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/45] | AL | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/37] | CZ | 25.11.2020 | |
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/36] | CZ | 25.11.2020 | |
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/35] | CZ | 25.11.2020 | |
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/33] | FI | 25.11.2020 | |
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/32] | FI | 25.11.2020 | |
| HR | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/28] | FI | 25.11.2020 | |
| HR | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/25] | FI | 25.11.2020 | |
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/23] | FI | 25.11.2020 | |
| LV | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/22] | FI | 25.11.2020 | |
| RS | 25.11.2020 | ||
| NO | 25.02.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/21] | FI | 25.11.2020 | |
| PT | 25.03.2021 | ||
| Former [2021/20] | FI | 25.11.2020 | Cited in | International search | [YD] US2015063927 (SJOO STURE et al.) | [Y] DE10308234 (KRATZ HEINZ HUBERT et al.) | [YA] DE202009009518 (HORN P HARTMETALL WERKZEUGFAB et al.) | [A] DE1627379 (ZAHNRADFABRIK FRIEDRICHSHAFEN et al.) | [AD] US2015314382 (SOBCZYK MARCEL et al.) | [A] EP2570218 (WFL MILLTURN TECH GMBH & CO KG et al.) | [A] US5876160 (JOHNSON WILLIAM B et al.) | [YD] EP0314647 (SANDVIK AB et al.) [YD] 1,2,4,5,7,16,17,21 * paragraph [0065] * | [Y] EP0132350 (MAAG-ZAHNRADER & -MASCHINEN AG) [Y] 1,2,4,5,7,16,17,21 * the whole document * | by applicant | DE243514 | US8950301 | DE102012011956 | US2015063927 | US2015314382 | WO2015036519 | CHRISTOPH KHLEWEIN: "Forschungsbericht", vol. 174, 2013, INSTITUT DER UNIVERSITT KARLSRUHE, article "Untersuchung und Optimierung des Wlzschlverfahrens mit Hilfe von 3D-FEM-Simulation", pages: 8 - 51,109-112,149-146,155-176 |