blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3392417

EP3392417 - SANITARY INSTALLATION SYSTEM WITH A MODULAR FUNCTIONAL SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.05.2022
Database last updated on 29.10.2024
FormerThe patent has been granted
Status updated on  18.06.2021
FormerGrant of patent is intended
Status updated on  22.02.2021
FormerRequest for examination was made
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  29.10.2020
FormerRequest for examination was made
Status updated on  03.05.2019
FormerThe application has been published
Status updated on  21.09.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
GROHEDAL Sanitärsysteme GmbH
Zur Porta 8-12
32457 Porta Westfalica / DE
[2018/43]
Inventor(s)01 / DREISCHMEIER, Lars
Twellsiekstraße 22
32457 Porta Westfalica / DE
02 / FUCHS, Norbert
Rispenweg 7
32425 Minden / DE
 [2021/29]
Former [2018/43]01 / Dreischmeier, Lars
Twellsiekstraße 22
32457 Porta Westfalica / DE
02 / Fuchs, Norbert
Rispenweg 7
32425 Minden / DE
Representative(s)Rössler, Matthias, et al
Karo IP Patentanwälte PartG mbB
Steinstraße 16-18
40212 Düsseldorf / DE
[N/P]
Former [2021/29]Rössler, Matthias, et al
karo IP Patentanwälte
Kahlhöfer Rößler Kreuels PartG mbB
Postfach 32 01 02
40416 Düsseldorf / DE
Former [2018/43]Rössler, Matthias, et al
Kahlhöfer Rößler Kreuels
Patentanwälte PartG mbB
(Karo IP Professionals)
Postfach 32 01 02
40416 Düsseldorf / DE
Application number, filing date18168503.320.04.2018
[2018/43]
Priority number, dateDE2017100382320.04.2017         Original published format: DE102017003823
[2018/43]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3392417
Date:24.10.2018
Language:DE
[2018/43]
Type: B1 Patent specification 
No.:EP3392417
Date:21.07.2021
Language:DE
[2021/29]
Search report(s)(Supplementary) European search report - dispatched on:EP13.09.2018
ClassificationIPC:E03D5/10, E03C1/05
[2018/43]
CPC:
E03D5/105 (EP); E03C1/057 (EP); E03D11/146 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/23]
Former [2018/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SANITÄRINSTALLATIONSSYSTEM MIT EINEM MODULAREN FUNKTIONSSYSTEM[2018/43]
English:SANITARY INSTALLATION SYSTEM WITH A MODULAR FUNCTIONAL SYSTEM[2018/43]
French:SYSTÈME D'INSTALLATION SANITAIRE POURVU D'UN SYSTÈME FONCTIONNEL MODULAIRE[2018/43]
Examination procedure24.04.2019Amendment by applicant (claims and/or description)
24.04.2019Examination requested  [2019/23]
24.04.2019Date on which the examining division has become responsible
30.10.2020Communication of intention to grant the patent
15.01.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
23.02.2021Communication of intention to grant the patent
09.06.2021Fee for grant paid
09.06.2021Fee for publishing/printing paid
09.06.2021Receipt of the translation of the claim(s)
Opposition(s)22.04.2022No opposition filed within time limit [2022/26]
Fees paidRenewal fee
30.03.2020Renewal fee patent year 03
29.04.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.04.2018
AL21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
MT21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
GB20.04.2022
IE20.04.2022
LU20.04.2022
[2024/42]
Former [2024/23]HU20.04.2018
AL21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
GB20.04.2022
IE20.04.2022
LU20.04.2022
Former [2024/20]HU20.04.2018
AL21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
GB20.04.2022
IE20.04.2022
LU20.04.2022
Former [2024/18]HU20.04.2018
AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
GB20.04.2022
IE20.04.2022
LU20.04.2022
Former [2023/20]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
GB20.04.2022
IE20.04.2022
LU20.04.2022
Former [2023/08]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
GB20.04.2022
LU20.04.2022
Former [2023/06]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/36]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/29]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/25]CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/24]CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/21]DK21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/11]ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/09]ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
PT22.11.2021
Former [2022/08]ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
Former [2022/07]LT21.07.2021
NL21.07.2021
NO21.10.2021
Documents cited:Search[A]US2008232302  (CHIU CHUN JUNG [TW]) [A] 1-10 * the whole document *;
 [A]WO2009124866  (LANG EDO [CH], et al) [A] 1-10* page 12, lines 5-17; figure 1 *;
 [I]DE202013100113U  (TOPROOM INNENAUSBAU & SANIERUNG GMBH [DE]) [I] 1-3,5,6,8,9 * the whole document *;
 [A]WO2016095556  (SHENZHEN TOPBAND CO LTD [CN]) [A] 1-10 * paragraphs [0014] , [ 0053] - [0055] *;
 [XA]CH711602  (BENITO BENEVENTO [CH], et al) [X] 10 * the whole document * [A] 1-9
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.