EP3657605 - TERMINAL BLOCK WITH LATERAL ELASTIC HANDLES [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 18.03.2022 Database last updated on 26.07.2024 | |
Former | Grant of patent is intended Status updated on 21.12.2021 | ||
Former | Examination is in progress Status updated on 16.07.2021 | ||
Former | Request for examination was made Status updated on 14.08.2020 | ||
Former | The application has been published Status updated on 24.04.2020 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Dinkle Enterprise Co., Ltd. No. 19, Wuquan 2nd Road Wugu District New Taipei City 24890 / TW | For all designated states Dinkle Electric Machinery (China) Co., Ltd. 258 Xingpu Middle Road Zhipu Town Kunshan Jiangsu 215343 / CN | [2020/22] | Inventor(s) | 01 /
Wu, Shang-Tsai DINKLE ENTERPRISE CO., LTD. No. 19, Wuquan 2nd Rd. Wugu Dist. 24890 New Taipei City / TW | [2020/22] | Representative(s) | 2K Patentanwälte Blasberg Kewitz & Reichel Partnerschaft mbB Schumannstrasse 27 60325 Frankfurt am Main / DE | [N/P] |
Former [2022/16] | Bals & Vogel Patentanwälte PartGmbB Konrad-Zuse-Str. 4 44801 Bochum / DE | ||
Former [2020/22] | Patentanwälte Bals & Vogel Universitätsstrasse 142 44799 Bochum / DE | Application number, filing date | 18207842.8 | 22.11.2018 | [2020/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3657605 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Type: | B1 Patent specification | No.: | EP3657605 | Date: | 20.04.2022 | Language: | EN | [2022/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.05.2019 | Classification | IPC: | H01R4/48, H01R13/11 | [2020/22] | CPC: |
H01R13/112 (EP);
H01R4/483 (EP);
H01R4/4821 (EP);
H01R4/4852 (EP);
H01R9/2491 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/38] |
Former [2020/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KLEMMLEISTE MIT SEITLICHEN ELASTISCHEN GRIFFEN | [2020/22] | English: | TERMINAL BLOCK WITH LATERAL ELASTIC HANDLES | [2020/22] | French: | BLOC TERMINAL À MANCHES ÉLASTIQUES LATÉRAUX | [2020/22] | Examination procedure | 30.08.2019 | Amendment by applicant (claims and/or description) | 07.08.2020 | Examination requested [2020/38] | 07.08.2020 | Date on which the examining division has become responsible | 20.07.2021 | Despatch of a communication from the examining division (Time limit: M04) | 30.09.2021 | Reply to a communication from the examining division | 22.12.2021 | Communication of intention to grant the patent | 09.03.2022 | Fee for grant paid | 09.03.2022 | Fee for publishing/printing paid | 09.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
20.01.2023
25.01.2023
ADMISSIBLE Phoenix Contact GmbH & Co. KG Flachsmarktstrasse 8 32825 Blomberg / DE Opponent's representative Gesthuysen Patentanwälte Partnerschaftsgesellschaft mbB Huyssenallee 68 45128 Essen / DE | [N/P] |
Former [2023/09] | |||
Opponent(s) | 01
20.01.2023
25.01.2023
ADMISSIBLE Phoenix Contact GmbH & Co. KG Flachsmarktstrasse 8 32825 Blomberg / DE Opponent's representative Gesthuysen Patentanwälte Patentanwälte Huyssenallee 100 45128 Essen / DE | 03.02.2023 | Invitation to proprietor to file observations on the notice of opposition | 12.06.2023 | Reply of patent proprietor to notice(s) of opposition | Fees paid | Renewal fee | 30.11.2020 | Renewal fee patent year 03 | 30.11.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.11.2018 | AL | 20.04.2022 | AT | 20.04.2022 | CY | 20.04.2022 | CZ | 20.04.2022 | DK | 20.04.2022 | EE | 20.04.2022 | ES | 20.04.2022 | FI | 20.04.2022 | HR | 20.04.2022 | LT | 20.04.2022 | LV | 20.04.2022 | MC | 20.04.2022 | MK | 20.04.2022 | NL | 20.04.2022 | PL | 20.04.2022 | RO | 20.04.2022 | RS | 20.04.2022 | SE | 20.04.2022 | SI | 20.04.2022 | SK | 20.04.2022 | SM | 20.04.2022 | BG | 20.07.2022 | NO | 20.07.2022 | GR | 21.07.2022 | IS | 20.08.2022 | PT | 22.08.2022 | GB | 22.11.2022 | IE | 22.11.2022 | LU | 22.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | FR | 30.11.2022 | LI | 30.11.2022 | [2024/27] |
Former [2024/21] | HU | 22.11.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CY | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
GB | 22.11.2022 | ||
IE | 22.11.2022 | ||
LU | 22.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 22.11.2018 | |
AL | 20.04.2022 | ||
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
GB | 22.11.2022 | ||
IE | 22.11.2022 | ||
LU | 22.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/52] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
GB | 22.11.2022 | ||
IE | 22.11.2022 | ||
LU | 22.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
GB | 22.11.2022 | ||
IE | 22.11.2022 | ||
LU | 22.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
GB | 22.11.2022 | ||
IE | 22.11.2022 | ||
LU | 22.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/47] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
GB | 22.11.2022 | ||
LU | 22.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
LU | 22.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
MC | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/25] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SI | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/17] | AL | 20.04.2022 | |
AT | 20.04.2022 | ||
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/09] | AT | 20.04.2022 | |
CZ | 20.04.2022 | ||
DK | 20.04.2022 | ||
EE | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RO | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
SK | 20.04.2022 | ||
SM | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2023/07] | AT | 20.04.2022 | |
DK | 20.04.2022 | ||
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/51] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
IS | 20.08.2022 | ||
PT | 22.08.2022 | ||
Former [2022/50] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
PL | 20.04.2022 | ||
RS | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/49] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
HR | 20.04.2022 | ||
LT | 20.04.2022 | ||
LV | 20.04.2022 | ||
NL | 20.04.2022 | ||
SE | 20.04.2022 | ||
BG | 20.07.2022 | ||
NO | 20.07.2022 | ||
GR | 21.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/47] | AT | 20.04.2022 | |
ES | 20.04.2022 | ||
FI | 20.04.2022 | ||
LT | 20.04.2022 | ||
NL | 20.04.2022 | ||
SE | 20.04.2022 | ||
NO | 20.07.2022 | ||
PT | 22.08.2022 | ||
Former [2022/44] | NL | 20.04.2022 | Documents cited: | Search | [A]DE3743410 (ELECTRO TERMINAL GMBH [AT]); | [A]EP1094551 (ELECTRO TERMINAL GMBH [AT]); | [A]DE19949387 (ELECTRO TERMINAL GMBH [AT], et al); | [XYI]US9397444 (WU SHANG-TSAI [TW]); | [YA]US9466897 (WU SHANG-TSAI [TW]) | Examination | DE3743410 | DE19949387 | Opposition | EP0246199 | DE3743410 | EP1094551 | US2012029549 | US9397444 | US9466897 |