| EP3646667 - ELECTRICAL HEATING ASSEMBLY, AEROSOL-GENERATING DEVICE AND METHOD FOR RESISTIVELY HEATING AN AEROSOL-FORMING SUBSTRATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 31.03.2026 | |
| Former | The patent has been granted Status updated on 25.06.2021 | ||
| Former | Grant of patent is intended Status updated on 28.01.2021 | ||
| Former | Request for examination was made Status updated on 03.04.2020 | ||
| Former | The international publication has been made Status updated on 04.01.2019 | ||
| Former | unknown Status updated on 02.07.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Philip Morris Products S.A. Quai Jeanrenaud 3 2000 Neuchâtel / CH | [2020/19] | Inventor(s) | 01 /
COURBAT, Jerome Christian Quai Jeanrenaud 3 2000 Neuchâtel / CH | 02 /
MIRONOV, Oleg Chemin du Chablais 4 1588 Cudrefin / CH | [2020/19] | Representative(s) | Bohest AG Holbeinstrasse 36-38 4051 Basel / CH | [2020/19] | Application number, filing date | 18732373.8 | 27.06.2018 | [2020/19] | WO2018EP67175 | Priority number, date | EP20170178378 | 28.06.2017 Original published format: EP 17178378 | [2020/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019002329 | Date: | 03.01.2019 | Language: | EN | [2019/01] | Type: | A1 Application with search report | No.: | EP3646667 | Date: | 06.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.01.2019 takes the place of the publication of the European patent application. | [2020/19] | Type: | B1 Patent specification | No.: | EP3646667 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | EP | 03.01.2019 | Classification | IPC: | H05B3/22, A24F47/00 | [2020/19] | CPC: |
H05B3/22 (EP,KR,RU,US);
A24F40/46 (EP,KR,US);
A24F40/44 (US);
A24F40/50 (EP,US);
A24F40/90 (US);
A24F47/00 (RU);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ANORDNUNG ZUR ELEKTRISCHEN ERWÄRMUNG, AEROSOLERZEUGUNGSVORRICHTUNG UND VERFAHREN ZUR RESISTIVEN ERWÄRMUNG EINES AEROSOLERZEUGENDEN SUBSTRATS | [2020/19] | English: | ELECTRICAL HEATING ASSEMBLY, AEROSOL-GENERATING DEVICE AND METHOD FOR RESISTIVELY HEATING AN AEROSOL-FORMING SUBSTRATE | [2020/19] | French: | ENSEMBLE DE CHAUFFAGE ÉLECTRIQUE, DISPOSITIF DE PRODUCTION D'AÉROSOL ET PROCÉDÉ DE CHAUFFAGE RÉSISTIF D'UN SUBSTRAT FORMANT UN AÉROSOL | [2021/07] |
| Former [2020/19] | ENSEMBLE DE CHAUFFAGE ÉLECTRIQUE, DISPOSITIF DE GÉNÉRATION D'AÉROSOL ET PROCÉDÉ DE CHAUFFAGE RÉSISTIF D'UN SUBSTRAT DE FORMATION D'AÉROSOL | Entry into regional phase | 17.09.2019 | National basic fee paid | 17.09.2019 | Designation fee(s) paid | 17.09.2019 | Examination fee paid | Examination procedure | 17.04.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 17.09.2019 | Examination requested [2020/19] | 17.09.2019 | Date on which the examining division has become responsible | 28.07.2020 | Amendment by applicant (claims and/or description) | 29.01.2021 | Communication of intention to grant the patent | 27.05.2021 | Fee for grant paid | 27.05.2021 | Fee for publishing/printing paid | 27.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 22.06.2021 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.06.2018 | AL | 28.07.2021 | AT | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | MT | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | TR | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | [2024/44] |
| Former [2024/29] | HU | 27.06.2018 | |
| AL | 28.07.2021 | ||
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| MK | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| TR | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2024/24] | HU | 27.06.2018 | |
| AL | 28.07.2021 | ||
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| MK | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2024/23] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| MK | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2024/20] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2023/08] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/29] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/25] | AT | 28.07.2021 | |
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/24] | AT | 28.07.2021 | |
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/21] | AT | 28.07.2021 | |
| DK | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/10] | AT | 28.07.2021 | |
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/09] | AT | 28.07.2021 | |
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/08] | AT | 28.07.2021 | |
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| Former [2022/07] | AT | 28.07.2021 | |
| LT | 28.07.2021 | ||
| NO | 28.10.2021 | Cited in | International search | [I] DE202013010986 (PIASECKI LESLAW et al.) | [I] WO2016050247 (FERTIN PHARMA AS et al.) [I] 1-4,11 * paragraph [0013]; claims 1,2 * | [A] US5666977 (HIGGINS CHARLES T et al.) [A] 1-13 * figure 1; claim 38 * | [A] US2015090256 (CHUNG HENRY et al.) [A] 1-13 * column 8, line 16 - line 29; figure 8 * | [A] EP0845220 (JAPAN TOBACCO INC et al.) [A] 1-13 * paragraph [0065] - paragraph [0066]; figures 1,2 * | [A] EP0250094 (METCAL INC et al.) [A] 1-13 * column 8, line 36 - line 49; figure 1 * | [A] CN106174706 (CHINA TOBACCO YUNNAN IND CO LTD et al.) [A] 1-13 * page 4, line 36 - line 49; figure 1 * * page 8, line 37 - line 43; figures 5,6 * | [A] AT509046 (BUCHBERGER HELMUT DR et al.) [A] 1-13 * the whole document * | by applicant | NATHAN O. SOKAL: "the bimonthly magazine QEX", January 2001, AMERICAN RADIO RELAY LEAGUE (ARRL, article "Class-E RF Power Amplifiers", pages: 9 - 20 |