| EP3717415 - VACUUM MOLD APPARATUS AND METHODS FOR FORMING CURVED MIRRORS [Right-click to bookmark this link] | |||
| Former [2020/41] | VACUUM MOLD APPARATUS, SYSTEMS, AND METHODS FOR FORMING CURVED MIRRORS | ||
| [2022/33] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 31.03.2026 | |
| Former | The patent has been granted Status updated on 27.01.2023 | ||
| Former | Grant of patent is intended Status updated on 08.09.2022 | ||
| Former | Request for examination was made Status updated on 04.09.2020 | ||
| Former | The international publication has been made Status updated on 08.06.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states 1/4 Corning Incorporated 1 Riverfront Plaza Corning, New York 14831 / US | [2020/41] | Inventor(s) | 01 /
CHAE, Kyubong 32 Taejang-ro 82beon-gil Yeongtong-gu Suwon-Si Gyeonggi-do 16687 / KR | 02 /
HONG, Sunghwa 212 Tangjeong-Ro Tangjeong-Myeon Asan-Si Chungcheongnam-do 31454 / KR | 03 /
JEE, Hongkeun 212 Tangjeong-Ro Tangjeong-Myeon Asan-Si Chungcheongnam-do 31454 / KR | 04 /
KIM, Jonghwa 10 Buldang 23-ro Seobuk-gu Cheonan-Si Chungcheongnam-do 31156 / KR | 05 /
LEE, Insu 35-23 Handeul 3-ro Seobuk-gu Cheonan-Si Chungcheongnam-do 31097 / KR | [2020/41] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2020/41] | Application number, filing date | 18883784.3 | 30.11.2018 | [2020/41] | WO2018KR15088 | Priority number, date | US201762592588P | 30.11.2017 Original published format: US 201762592588 P | [2020/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2019108015 | Date: | 06.06.2019 | Language: | EN | [2019/23] | Type: | A2 Application without search report | No.: | EP3717415 | Date: | 07.10.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.06.2019 takes the place of the publication of the European patent application. | [2020/41] | Type: | B1 Patent specification | No.: | EP3717415 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Search report(s) | International search report - published on: | KR | 22.08.2019 | (Supplementary) European search report - dispatched on: | EP | 06.07.2021 | Classification | IPC: | C03B23/035, B29D11/00, G02B5/10, G02B27/01 | [2021/31] | CPC: |
B29D11/00596 (EP,US);
C03B23/0357 (EP,KR);
G02B27/0101 (EP,US);
G02B5/10 (EP,US);
G02B2027/011 (EP,US);
G02B2027/013 (EP,US);
|
| Former IPC [2020/41] | C03B23/035 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VAKUUMFORMVORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG VON GEKRÜMMTEN SPIEGELN | [2022/33] | English: | VACUUM MOLD APPARATUS AND METHODS FOR FORMING CURVED MIRRORS | [2022/33] | French: | APPAREIL DE MOULAGE SOUS VIDE ET PROCÉDÉS DE FORMATION DE MIROIRS INCURVÉS | [2022/33] |
| Former [2020/41] | VAKUUMFORMVORRICHTUNG, SYSTEME UND VERFAHREN ZUR HERSTELLUNG VON GEKRÜMMTEN SPIEGELN | ||
| Former [2020/41] | VACUUM MOLD APPARATUS, SYSTEMS, AND METHODS FOR FORMING CURVED MIRRORS | ||
| Former [2020/41] | APPAREIL DE MOULAGE SOUS VIDE, SYSTÈMES ET PROCÉDÉS DE FORMATION DE MIROIRS INCURVÉS | Entry into regional phase | 29.05.2020 | National basic fee paid | 29.05.2020 | Search fee paid | 29.05.2020 | Designation fee(s) paid | 29.05.2020 | Examination fee paid | Examination procedure | 29.05.2020 | Examination requested [2020/41] | 31.01.2022 | Amendment by applicant (claims and/or description) | 09.09.2022 | Communication of intention to grant the patent | 19.01.2023 | Fee for grant paid | 19.01.2023 | Fee for publishing/printing paid | 19.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 10.11.2020 | Renewal fee patent year 03 | 08.11.2021 | Renewal fee patent year 04 | 10.11.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 30.11.2018 | HU | 30.11.2018 | AT | 01.03.2023 | BG | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | TR | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | BE | 30.11.2023 | CH | 30.11.2023 | GB | 30.11.2023 | IE | 30.11.2023 | LU | 30.11.2023 | [2026/04] |
| Former [2025/39] | CY | 30.11.2018 | |
| HU | 30.11.2018 | ||
| AT | 01.03.2023 | ||
| BG | 01.03.2023 | ||
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| GB | 30.11.2023 | ||
| IE | 30.11.2023 | ||
| LU | 30.11.2023 | ||
| Former [2025/36] | CY | 30.11.2018 | |
| AT | 01.03.2023 | ||
| BG | 01.03.2023 | ||
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| GB | 30.11.2023 | ||
| IE | 30.11.2023 | ||
| LU | 30.11.2023 | ||
| Former [2024/51] | AT | 01.03.2023 | |
| BG | 01.03.2023 | ||
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| GB | 30.11.2023 | ||
| IE | 30.11.2023 | ||
| LU | 30.11.2023 | ||
| Former [2024/47] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| GB | 30.11.2023 | ||
| IE | 30.11.2023 | ||
| LU | 30.11.2023 | ||
| Former [2024/46] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| CH | 30.11.2023 | ||
| IE | 30.11.2023 | ||
| LU | 30.11.2023 | ||
| Former [2024/34] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| CH | 30.11.2023 | ||
| LU | 30.11.2023 | ||
| Former [2024/32] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| MC | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| Former [2024/26] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| IT | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| Former [2024/10] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| DK | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SI | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| Former [2023/50] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SK | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| IS | 01.07.2023 | ||
| PT | 03.07.2023 | ||
| Former [2023/49] | AT | 01.03.2023 | |
| CZ | 01.03.2023 | ||
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RO | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| PT | 03.07.2023 | ||
| Former [2023/48] | AT | 01.03.2023 | |
| EE | 01.03.2023 | ||
| ES | 01.03.2023 | ||
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| PT | 03.07.2023 | ||
| Former [2023/46] | ES | 01.03.2023 | |
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| SM | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| PT | 03.07.2023 | ||
| Former [2023/38] | ES | 01.03.2023 | |
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| NL | 01.03.2023 | ||
| PL | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| Former [2023/37] | ES | 01.03.2023 | |
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| GR | 02.06.2023 | ||
| Former [2023/36] | ES | 01.03.2023 | |
| FI | 01.03.2023 | ||
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| LV | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| SE | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| Former [2023/35] | ES | 01.03.2023 | |
| HR | 01.03.2023 | ||
| LT | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| NO | 01.06.2023 | ||
| Former [2023/34] | ES | 01.03.2023 | |
| LT | 01.03.2023 | ||
| RS | 01.03.2023 | ||
| Former [2023/33] | ES | 01.03.2023 | |
| LT | 01.03.2023 | Documents cited: | Search | [XA] KR20170106263 (CORNING PREC MATERIALS CO LTD et al.) [X] 9 * paragraph [0035]; figures 3-4,6 * * paragraph [0036] * * paragraph [0047] * * paragraph [0011] * * paragraph [0017] *[A] 1-8,10-15 | [A] KR20140111403 (LG ELECTRONICS INC et al.) [A] 1-15 * itemas 20,112c,112,124,12,14, paragraphs [0019]-[0022], figures 1-4. * | [A] BAILLON P ET AL: "AN IMPROVED METHOD FOR MANUFACTURING ACCURATE AND CHEAP GLASS PARABOLIC MIRRORS", NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ELSEVIER BV * NORTH-HOLLAND, NL, vol. A276, no. 3, 1 April 1989 (1989-04-01), pages 492 - 495, XP000051982, ISSN: 0168-9002, DOI: 10.1016/0168-9002(89)90574-3 [A] 1-15 * figure; paragraph [0004] * DOI: http://dx.doi.org/10.1016/0168-9002(89)90574-3 | International search | [Y] KR20140111403 (LG ELECTRONICS INC et al.) [Y] 1-3, 18-20, 27-29 ,44-46 * See paragraphs [0019]-[0022], [0030]; figures 1-4. * | [Y] US2004001077 (PATTERSON BRET et al.) [Y] 1-3, 18-20, 27-29 ,44-46 * See paragraph [0001]; figures 1-2. * | [Y] KR20170106263 (CORNING PREC MATERIALS CO LTD et al.) [Y] 27-29, 44-46 * See paragraph [0032]; figures 3-4. * | [A] US2009117332 (ELLSWORTH JASON et al.) [A] 1-3, 18-20, 27-29 ,44-46 * See the whole document. * | [A] US2008000937 (HOLMBERG PER et al.) [A] 1-3, 18-20, 27-29 ,44-46 * See the whole document. * | by applicant | KR20170106263 |