blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3603818

EP3603818 - APPARATUS FOR PAINTING ARTICLES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.06.2022
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  25.06.2021
FormerGrant of patent is intended
Status updated on  18.04.2021
FormerRequest for examination was made
Status updated on  03.07.2020
FormerThe application has been published
Status updated on  03.01.2020
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
TAPEMATIC S.p.A.
Via Vimercate, 42
20876 Ornago (Monza Brianza) / IT
[2020/06]
Inventor(s)01 / PEREGO, Luciano
c/o TAPEMATIC S.P.A.
VIA VIMERCATE 42
20876 ORNAGO (MONZA BRIANZA) / IT
 [2020/06]
Representative(s)Tansini, Elio Fabrizio
Bugnion S.p.A.
Viale Lancetti 17
20158 Milano / IT
[2020/06]
Application number, filing date19182300.425.06.2019
[2020/06]
Priority number, dateIT2018000770931.07.2018         Original published format: IT201800007709
[2020/06]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3603818
Date:05.02.2020
Language:EN
[2020/06]
Type: B1 Patent specification 
No.:EP3603818
Date:28.07.2021
Language:EN
[2021/30]
Search report(s)(Supplementary) European search report - dispatched on:EP18.12.2019
ClassificationIPC:B05B13/02, B05B16/00, B05B15/652, B05B15/68, // B05B1/14
[2020/06]
CPC:
B05B13/0278 (EP); B05B16/90 (US); B05B12/002 (US);
B05B13/0235 (EP,US); B05B13/0442 (US); B05B13/0447 (US);
B05B16/20 (US); B05B16/40 (US); B05B1/14 (EP);
B05B14/40 (US); B05B15/652 (EP); B05B15/68 (EP);
B05B16/95 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
Former [2020/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EINRICHTUNG ZUM LACKIEREN VON ARTIKELN[2021/26]
English:APPARATUS FOR PAINTING ARTICLES[2020/06]
French:DISPOSITIF POUR PEINDRE DES ARTICLES[2021/26]
Former [2020/06]EINRICHTUNG ZUM AUFTRAGEN EINES LACKES AUF WERKSTOFFE
Former [2020/06]DISPOSITIF POUR LAQUER DES ARTICLES
Examination procedure30.06.2020Amendment by applicant (claims and/or description)
30.06.2020Examination requested  [2020/32]
30.06.2020Date on which the examining division has become responsible
19.04.2021Communication of intention to grant the patent
25.05.2021Fee for grant paid
25.05.2021Fee for publishing/printing paid
25.05.2021Receipt of the translation of the claim(s)
Opposition(s)29.04.2022No opposition filed within time limit [2022/27]
Fees paidRenewal fee
17.06.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.06.2019
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
MT28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
[2024/44]
Former [2024/29]HU25.06.2019
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
TR28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2024/25]HU25.06.2019
AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2024/23]AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
MK28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2024/20]AL28.07.2021
AT28.07.2021
CY28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2023/08]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
MC28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/36]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
IT28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/29]AL28.07.2021
AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SI28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/25]AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
SM28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/24]AT28.07.2021
CZ28.07.2021
DK28.07.2021
EE28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RO28.07.2021
RS28.07.2021
SE28.07.2021
SK28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/21]AT28.07.2021
DK28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/10]AT28.07.2021
ES28.07.2021
FI28.07.2021
HR28.07.2021
LT28.07.2021
LV28.07.2021
NL28.07.2021
PL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
GR29.10.2021
IS28.11.2021
PT29.11.2021
Former [2022/09]AT28.07.2021
ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
RS28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
PT29.11.2021
Former [2022/08]AT28.07.2021
ES28.07.2021
FI28.07.2021
LT28.07.2021
NL28.07.2021
SE28.07.2021
BG28.10.2021
NO28.10.2021
Former [2022/07]AT28.07.2021
LT28.07.2021
NL28.07.2021
NO28.10.2021
Documents cited:Search[XAY]US4173198  (ALLEN RONALD E [US]) [X] 1-3,8,10,11 * column 3, line 15 - line 51 * * figures 2,3 * [A] 5-7,9 [Y] 4;
 [XAY]EP0041482  (TABU SPA [IT]) [X] 1-3,8,10,11 * page 4 - page 5 * * pages 1,2 * [A] 5-7,9 [Y] 4;
 [XAY]US4458626  (DESSILANI TERESIO [IT]) [X] 1-3,8,10,11 * column 2, line 11 - line 34 * * figure 3 * [A] 5-7,9 [Y] 4;
 [YA]US4541565  (DEIMERLY THOMAS R [US], et al) [Y] 1-4,8,10,11 * column 4, line 19 - line 44 * * figure 1 * [A] 5-7,9;
 [YA]US5482556  (SHUTIC JEFFREY R [US], et al) [Y] 1-4,8,10,11 * column 10 * * figure 1 * [A] 5-7,9;
 [XAY]US2004065752  (MATHER BRIAN D [US], et al) [X] 1-3,8,10,11 * paragraph [0030] - paragraph [0040] * * figures 3-7 * [A] 5-7,9 [Y] 4;
 [YA]US2007169691  (RODRIGUES JOSE [FR], et al) [Y] 1-4,8,10,11 * paragraph [0045] - paragraph [0053] * * figures 1,2 * [A] 5-7,9;
 [Y]US2009155449  (PLANS ISAAC [IE], et al) [Y] 4 * paragraph [0030] - paragraph [0031] ** figure 1a *;
 [YA]US2009304930  (CHAIMBERG MICHAEL [CA]) [Y] 1-4,8,10,11 * paragraph [0030] - paragraph [0031] * * figures 3a,3b * [A] 5-7,9
by applicantUS9487857
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.