blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3667922

EP3667922 - OSCILLATOR LOCKED BY INJECTION WITH VARIABLE LOAD IMPEDANCE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  29.04.2022
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  21.05.2021
FormerGrant of patent is intended
Status updated on  19.01.2021
FormerRequest for examination was made
Status updated on  15.05.2020
Most recent event   Tooltip14.07.2023Lapse of the patent in a contracting state
New state(s): HU
published on 16.08.2023  [2023/33]
Applicant(s)For all designated states
Commissariat à l'énergie atomique et aux énergies alternatives
Bâtiment le Ponant
25, rue Leblanc
75015 Paris / FR
[2020/25]
Inventor(s)01 / BADETS, Franck
CEA GRENOBLE 17 rue des Martyrs
38054 GRENOBLE CEDEX 09 / FR
 [2020/25]
Representative(s)Brevalex
Tour Trinity
1 B Place de la Défense
92400 Courbevoie / FR
[N/P]
Former [2020/25]Brevalex
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
Application number, filing date19214884.910.12.2019
[2020/25]
Priority number, dateFR2018007271411.12.2018         Original published format: FR 1872714
[2020/25]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3667922
Date:17.06.2020
Language:FR
[2020/25]
Type: B1 Patent specification 
No.:EP3667922
Date:23.06.2021
Language:FR
[2021/25]
Search report(s)(Supplementary) European search report - dispatched on:EP20.05.2020
ClassificationIPC:H03L7/24
[2020/25]
CPC:
H03L7/24 (EP,US); H03B19/14 (US); H03B5/1265 (US);
H03K3/0231 (US); H03K3/0315 (US); H03L7/0805 (US);
H03B2200/0074 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/25]
TitleGerman:DURCH EINSPRITZUNG GERASTETER OSZILLATOR MIT VARIABLER LASTIMPEDANZ[2020/25]
English:OSCILLATOR LOCKED BY INJECTION WITH VARIABLE LOAD IMPEDANCE[2020/25]
French:OSCILLATEUR VERROUILLE PAR INJECTION A IMPEDANCE DE CHARGE VARIABLE[2020/25]
Examination procedure10.12.2019Examination requested  [2020/25]
20.01.2021Communication of intention to grant the patent
10.05.2021Fee for grant paid
10.05.2021Fee for publishing/printing paid
10.05.2021Receipt of the translation of the claim(s)
Opposition(s)24.03.2022No opposition filed within time limit [2022/22]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.12.2019
AL23.06.2021
AT23.06.2021
CY23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
IT23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
IE10.12.2021
LU10.12.2021
BE31.12.2021
[2023/33]
Former [2023/30]AL23.06.2021
AT23.06.2021
CY23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
IT23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
IE10.12.2021
LU10.12.2021
BE31.12.2021
Former [2023/01]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
IT23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
IE10.12.2021
LU10.12.2021
BE31.12.2021
Former [2022/48]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
IT23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
IE10.12.2021
LU10.12.2021
Former [2022/46]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
IT23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
LU10.12.2021
Former [2022/36]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
IT23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
Former [2022/33]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
MC23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
Former [2022/29]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SI23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
Former [2022/26]AL23.06.2021
AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
Former [2022/21]AT23.06.2021
CZ23.06.2021
DK23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
Former [2022/11]AT23.06.2021
CZ23.06.2021
EE23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
PL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
IS23.10.2021
PT25.10.2021
Former [2022/09]AT23.06.2021
CZ23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
RO23.06.2021
RS23.06.2021
SE23.06.2021
SK23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
PT25.10.2021
Former [2022/08]AT23.06.2021
CZ23.06.2021
ES23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
RS23.06.2021
SE23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
Former [2022/07]AT23.06.2021
FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
NL23.06.2021
RS23.06.2021
SE23.06.2021
SM23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
Former [2021/51]FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
RS23.06.2021
SE23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
Former [2021/49]FI23.06.2021
HR23.06.2021
LT23.06.2021
LV23.06.2021
SE23.06.2021
BG23.09.2021
NO23.09.2021
GR24.09.2021
Former [2021/47]FI23.06.2021
LT23.06.2021
BG23.09.2021
Former [2021/46]FI23.06.2021
LT23.06.2021
Documents cited:Search[AD]EP3312568  (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [AD] 1-17 * paragraph [0033] - paragraph [0045]; figures 4,5 *;
 [A]US2010134152  (BENYAHIA MOHAMED [MA], et al) [A] 1-17 * paragraph [0040] - paragraph [0056]; figures 1-5 *;
 [A]US6317008  (GABARA THADDEUS J [US]) [A] 1-17 * column 5, line 65 - column 7, line 42; figures 3-9 *
by applicantEP3312568
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.