| EP3835366 - THERMOSETTING RESIN COMPOSITION COMPRISING FLAME RETARDANT INCLUDING AROMATIC PHOSPHORIC ACID ESTER AND CURED MATERIAL [Right-click to bookmark this link] | |||
| Former [2021/24] | FLAME RETARDANT FOR THERMOSETTING RESIN INCLUDING AROMATIC PHOSPHORIC ACID ESTER, THERMOSETTING RESIN COMPOSITION INCLUDING SAME, AND CURED MATERIAL AND APPLICATION OF SAME | ||
| [2023/05] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 31.03.2023 | ||
| Former | Grant of patent is intended Status updated on 05.02.2023 | ||
| Former | Request for examination was made Status updated on 14.05.2021 | ||
| Former | The international publication has been made Status updated on 15.02.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Daihachi Chemical Industry Co., Ltd. 8-13, Hiranomachi 1-chome Chuo-ku Osaka-shi Osaka 541-0046 / JP | [2021/24] | Inventor(s) | 01 /
YAHATA, Shunsuke c/o Osaka R&D Laboratory, DAIHACHI CHEMICAL INDUSTRY CO.,LTD., 5-7, Chodo 3-chome Higashiosaka-shi, Osaka 577-0056 / JP | [2021/24] | Representative(s) | Zanoli, Enrico, et al Zanoli & Giavarini S.p.A. Via Melchiorre Gioia, 64 20125 Milano / IT | [2021/24] | Application number, filing date | 19847820.8 | 11.06.2019 | [2021/24] | WO2019JP23119 | Priority number, date | JP20180147674 | 06.08.2018 Original published format: JP 2018147674 | [2021/24] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020031495 | Date: | 13.02.2020 | Language: | JA | [2020/07] | Type: | A1 Application with search report | No.: | EP3835366 | Date: | 16.06.2021 | Language: | EN | [2021/24] | Type: | B1 Patent specification | No.: | EP3835366 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Search report(s) | International search report - published on: | JP | 13.02.2020 | (Supplementary) European search report - dispatched on: | EP | 07.04.2022 | Classification | IPC: | C08L101/00, B32B5/28, B32B27/18, C07F9/09, C08J5/24, C08K5/523, H05K1/03, C09K21/12 | [2022/18] | CPC: |
C07F9/094 (EP);
C08K5/523 (EP,KR,US);
C09K21/12 (EP,US);
B32B27/20 (KR);
B32B5/022 (EP);
B32B5/024 (EP);
B32B5/26 (EP);
C07F9/095 (US);
C08J5/24 (KR);
C08J5/249 (EP,US);
C08K5/0066 (KR);
C08L63/00 (KR,US);
H05K1/0373 (EP,KR);
B32B2250/20 (EP);
B32B2255/02 (EP);
B32B2255/26 (EP);
B32B2260/021 (EP);
B32B2260/046 (EP);
B32B2262/02 (EP);
B32B2262/0261 (EP);
B32B2262/0276 (EP);
B32B2262/10 (EP);
B32B2262/101 (EP);
B32B2305/076 (KR);
B32B2307/3065 (EP);
B32B2457/08 (EP,KR);
C08J2363/00 (EP,KR,US);
| C-Set: |
C08K5/523, C08L63/00 (EP)
|
| Former IPC [2021/24] | C08L101/00, B32B5/28, B32B27/18, C07F9/09, C08J5/24, C08K5/523, H05K1/03 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/24] | Title | German: | WÄRMEHÄRTBARE HARZZUSAMMENSETZUNG ENTHALTEND FLAMMSCHUTZMITTEL MIT AROMATISCHEM PHOSPHORSÄUREESTER UND GEHÄRTETES MATERIAL | [2023/05] | English: | THERMOSETTING RESIN COMPOSITION COMPRISING FLAME RETARDANT INCLUDING AROMATIC PHOSPHORIC ACID ESTER AND CURED MATERIAL | [2023/05] | French: | COMPOSITION DE RÉSINE THERMODURCISSABLE COMPRENANT IGNIFUGE COMPRENANT UN ESTER D'ACIDE PHOSPHORIQUE AROMATIQUE ET MATÉRIAU DURCI | [2023/05] |
| Former [2021/24] | FLAMMSCHUTZMITTEL FÜR WÄRMEHÄRTENDES HARZ MIT AROMATISCHEM PHOSPHORSÄUREESTER, WÄRMEHÄRTBARE HARZZUSAMMENSETZUNG DAMIT UND GEHÄRTETES MATERIAL SOWIE VERWENDUNG DAVON | ||
| Former [2021/24] | FLAME RETARDANT FOR THERMOSETTING RESIN INCLUDING AROMATIC PHOSPHORIC ACID ESTER, THERMOSETTING RESIN COMPOSITION INCLUDING SAME, AND CURED MATERIAL AND APPLICATION OF SAME | ||
| Former [2021/24] | IGNIFUGE POUR RÉSINE THERMODURCISSABLE COMPRENANT UN ESTER D'ACIDE PHOSPHORIQUE AROMATIQUE, COMPOSITION DE RÉSINE THERMODURCISSABLE LE COMPRENANT, ET MATÉRIAU DURCI ET APPLICATION ASSOCIÉE | Entry into regional phase | 02.03.2021 | Translation filed | 02.03.2021 | National basic fee paid | 02.03.2021 | Search fee paid | 02.03.2021 | Designation fee(s) paid | 02.03.2021 | Examination fee paid | Examination procedure | 02.03.2021 | Examination requested [2021/24] | 27.10.2022 | Amendment by applicant (claims and/or description) | 06.02.2023 | Communication of intention to grant the patent | 24.03.2023 | Fee for grant paid | 24.03.2023 | Fee for publishing/printing paid | 24.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 02.03.2021 | Renewal fee patent year 03 | 31.03.2022 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 11.06.2019 | HU | 11.06.2019 | AT | 03.05.2023 | BG | 03.05.2023 | CZ | 03.05.2023 | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | IT | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | MC | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | TR | 03.05.2023 | IE | 11.06.2023 | LU | 11.06.2023 | BE | 30.06.2023 | CH | 30.06.2023 | FR | 03.07.2023 | GB | 03.08.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | PT | 04.09.2023 | [2026/05] |
| Former [2025/39] | CY | 11.06.2019 | |
| HU | 11.06.2019 | ||
| AT | 03.05.2023 | ||
| BG | 03.05.2023 | ||
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| IT | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SI | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| FR | 03.07.2023 | ||
| GB | 03.08.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2025/36] | CY | 11.06.2019 | |
| AT | 03.05.2023 | ||
| BG | 03.05.2023 | ||
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| IT | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SI | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| FR | 03.07.2023 | ||
| GB | 03.08.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/51] | AT | 03.05.2023 | |
| BG | 03.05.2023 | ||
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| IT | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SI | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| FR | 03.07.2023 | ||
| GB | 03.08.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/33] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| IT | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SI | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| FR | 03.07.2023 | ||
| GB | 03.08.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/26] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| IT | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SI | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| FR | 03.07.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/25] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SI | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| BE | 30.06.2023 | ||
| CH | 30.06.2023 | ||
| FR | 03.07.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/21] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| IE | 11.06.2023 | ||
| LU | 11.06.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/15] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| LU | 11.06.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/14] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| MC | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/10] | AT | 03.05.2023 | |
| CZ | 03.05.2023 | ||
| DK | 03.05.2023 | ||
| EE | 03.05.2023 | ||
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RO | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/08] | AT | 03.05.2023 | |
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| SK | 03.05.2023 | ||
| SM | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/03] | AT | 03.05.2023 | |
| ES | 03.05.2023 | ||
| FI | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2024/01] | AT | 03.05.2023 | |
| ES | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| LT | 03.05.2023 | ||
| LV | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2023/51] | AT | 03.05.2023 | |
| ES | 03.05.2023 | ||
| HR | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| RS | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2023/50] | AT | 03.05.2023 | |
| ES | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| PL | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| GR | 04.08.2023 | ||
| IS | 03.09.2023 | ||
| PT | 04.09.2023 | ||
| Former [2023/48] | AT | 03.05.2023 | |
| ES | 03.05.2023 | ||
| NL | 03.05.2023 | ||
| SE | 03.05.2023 | ||
| NO | 03.08.2023 | ||
| PT | 04.09.2023 | ||
| Former [2023/46] | ES | 03.05.2023 | |
| PT | 04.09.2023 | Documents cited: | Search | [XA] WO02055526 (BAYER AG et al.) [X] 1,3,4 * examples 1-4 *[A] 2,5-12 | [E] EP3753998 (DAIHACHI CHEM IND et al.) [E] 1-5 * claim 4 * | [A] WO2017094489 (NAMICS CORP et al.) [A] 1-12 * paragraphs [0016] - [0024] * | International search | [Y] JP2004527474 [Y] 1-3, 5-12 * , claims, paragraph [0001], examples & US 2002/0137821 A1, claims, paragraph [0001], examples & WO 2002/055526 A1 & EP 1351965 A1 & CN 1486324 A & KR 10-0801836 B1 * | [Y] JP2005520905 [Y] 1-3, 5-12 * , claims, paragraphs [0078]-[0081], examples & US 2003/0191250 A1, claims, paragraphs [0109]-[0116], examples & WO 2003/080727 A1 & EP 1490436 A1 & CN 1653133 A & KR 10-2004-0097224 A * | [Y] JP2009530456 [Y] 1-3, 5-12 * , claims, paragraphs [0067]-[0073], examples & US 2007/0225441 A1, claims, paragraphs [0091]-[0104], examples & WO 2007/107255 A2 & EP 1999211 A2 & KR 10-2008-0102220 A & CN 101405343 A * | [Y] JP2009530455 [Y] 1-3, 5-12 * , claims, paragraphs [0068]-[0074], examples & US 2007/0225412 A1, claims, paragraphs [0085]-[0095], examples & WO 2007/107252 A1 & EP 1998951 A1 & KR 10-2008-0104326 A & CN 101405127 A * | [Y] WO2017094489 (NAMICS CORP et al.) [Y] 1-3, 5-12 * , claims, paragraphs [0015]-[0025], [0043], [0063], examples & CN 108368349 A & KR 10-2018-0088659 A * | [Y] JP2016060881 (HITACHI CHEMICAL CO LTD et al.) [Y] 1-3, 5-12 * , claims, paragraphs [0002], [0010], [0037], [0042], examples (Family: none) * | [A] JPS5755947 (ADEKA ARGUS CHEMICAL CO LTD et al.) [A] 1-12 * , claims, page 6, upper left column, examples (Family: none) * | [Y] WAWRZYN, E. ET AL.: "Are novel aryl phosphates competitors for bisphenol A bis(diphenyl phosphate) in halogen-free flame-retarded polycarbonate/acrylonitrile-butadiene-styrene blends?", EUROPEAN POLYMER JOURNAL, vol. 48, 2012, pages 1561 - 1574, XP028933221, DOI: 10.1016/j.eurpolymj.2012.06.015 [Y] 1-3, 5-12 DOI: http://dx.doi.org/10.1016/j.eurpolymj.2012.06.015 | by applicant | JP2004051907 | JP2002284963 | JP2013177599 | JP2006117723 | WO2016175325 | US2016024304 |