blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3699357

EP3699357 - WORK TRAIN COMPRISING A SELF-PROPELLED SOIL WORKING MACHINE AND AT LEAST ONE OTHER SELF-PROPELLED VEHICLE, WITH AN AUTOMATED DISTANCE MONITORING [Right-click to bookmark this link]
Former [2020/35]WORK TRAIN COMPRISING TWO SOIL WORKING MACHINES WITH AN AUTOMATED DISTANCE MONITORING
[2021/04]
StatusNo opposition filed within time limit
Status updated on  27.05.2022
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  18.06.2021
FormerGrant of patent is intended
Status updated on  31.01.2021
FormerRequest for examination was made
Status updated on  25.09.2020
FormerThe application has been published
Status updated on  24.07.2020
Most recent event   Tooltip12.04.2024Lapse of the patent in a contracting state
New state(s): CY
published on 15.05.2024 [2024/20]
Applicant(s)For all designated states
Wirtgen GmbH
Reinhard-Wirtgen-Strasse 2
53578 Windhagen / DE
[2020/35]
Inventor(s)01 / FRITZ, Matthias
Geistingerstraße 131
53773 Hennef / DE
02 / LANGE, Herbert
Birkenhang 7
51491 Overath / DE
03 / PEES, Marc
Im Großen Boden 2
56589 Niederbreitbach / DE
04 / KANIA, Carmen
Kesselscheid 8
53809 Ruppichteroth / DE
 [2021/29]
Former [2020/35]01 / Fritz, Matthias
Geistingerstraße 131
53773 Hennef / DE
02 / Lange, Herbert
Birkenhang 7
51491 Overath / DE
03 / Pees, Marc
Im Großen Boden 2
56589 Niederbreitbach / DE
04 / Kania, Carmen
Kesselscheid 8
53809 Ruppichteroth / DE
Representative(s)Ruttensperger Lachnit Trossin Gomoll
Patent- und Rechtsanwälte
PartG mbB
Arnulfstraße 58
80335 München / DE
[2020/35]
Application number, filing date20157903.418.02.2020
[2020/35]
Priority number, dateDE20191010421819.02.2019         Original published format: DE102019104218
[2020/35]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3699357
Date:26.08.2020
Language:DE
[2020/35]
Type: B1 Patent specification 
No.:EP3699357
Date:21.07.2021
Language:DE
[2021/29]
Search report(s)(Supplementary) European search report - dispatched on:EP22.07.2020
ClassificationIPC:E01C19/00, E01C19/48, E01C23/088, G05D1/02, H04W4/38, H04W4/46
[2021/04]
CPC:
E01C19/004 (EP); E01C19/00 (CN); B60W30/165 (US);
B60W10/04 (US); B60W10/18 (US); E01C19/006 (CN);
E01C19/48 (EP,CN); E01C19/4886 (CN); E01C21/00 (CN);
G05D1/024 (EP); G05D1/0259 (EP); G05D1/0293 (EP);
H04W4/38 (EP); H04W4/46 (EP); B60T2201/02 (US);
B60W2300/17 (US); B60W2510/06 (US); B60W2510/18 (US);
B60W2520/10 (US); B60W2520/14 (US); B60W2520/16 (US);
B60W2554/802 (US); E01C23/065 (US); E01C23/088 (EP);
E01C2301/04 (EP) (-)
Former IPC [2020/35]E01C19/00, E01C19/48, E01C23/088, G05D1/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/44]
Former [2020/35]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ARBEITSZUG, UMFASSEND EINE SELBSTFAHRENDE BODENBEARBEITUNGSMASCHINE UND WENIGSTENS EIN WEITERES SELBSTFAHRENDES FAHRZEUG, MIT EINER AUTOMATISIERTEN ABSTANDSÜBERWACHUNG[2021/28]
English:WORK TRAIN COMPRISING A SELF-PROPELLED SOIL WORKING MACHINE AND AT LEAST ONE OTHER SELF-PROPELLED VEHICLE, WITH AN AUTOMATED DISTANCE MONITORING[2021/28]
French:TRAIN DE TRAVAUX, COMPRENANT UNE MACHINE AUTOPROPULSÉE DE TRAITEMENT DU SOL ET AU MOINS UN AUTRE VÉHICULE AUTOPROPULSÉ, AVEC UNE SURVEILLANCE AUTOMATISÉE DES DISTANCES[2021/28]
Former [2020/35]ARBEITSZUG, UMFASSEND ZWEI BODENBEARBEITUNGSMASCHINEN MIT EINER AUTOMATISIERTEN ABSTANDSÜBERWACHUNG
Former [2020/35]WORK TRAIN COMPRISING TWO SOIL WORKING MACHINES WITH AN AUTOMATED DISTANCE MONITORING
Former [2020/35]TRAIN DE TRAVAUX, COMPRENANT DEUX MACHINES DE TRAITEMENT DU SOL AVEC UNE SURVEILLANCE AUTOMATISÉE DES DISTANCES
Examination procedure21.09.2020Amendment by applicant (claims and/or description)
21.09.2020Examination requested  [2020/44]
21.09.2020Date on which the examining division has become responsible
01.02.2021Communication of intention to grant the patent
09.06.2021Fee for grant paid
09.06.2021Fee for publishing/printing paid
09.06.2021Receipt of the translation of the claim(s)
Opposition(s)22.04.2022No opposition filed within time limit [2022/26]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE18.02.2022
LU18.02.2022
BE28.02.2022
[2024/20]
Former [2023/10]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE18.02.2022
LU18.02.2022
BE28.02.2022
Former [2023/09]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE18.02.2022
LU18.02.2022
Former [2022/47]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
LU18.02.2022
Former [2022/44]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/36]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/29]AL21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/25]CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/24]CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/21]DK21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/11]ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/09]ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
PT22.11.2021
Former [2022/08]ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
Former [2022/07]LT21.07.2021
NL21.07.2021
NO21.10.2021
Documents cited:Search[AD]US2018142427  (TKACHENKO OLEG [US], et al) [AD] 1-15 * figures 4-7 * * paragraphs [0046] , [0048] , [0049] ** the whole document *
by applicantUS2018142427
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.