blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3708927

EP3708927 - TEMPERATURE CONTROLLED CONTAINER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.09.2022
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  24.09.2021
FormerGrant of patent is intended
Status updated on  26.05.2021
FormerRequest for examination was made
Status updated on  14.08.2020
Most recent event   Tooltip28.07.2023Lapse of the patent in a contracting state
New state(s): CH, LI
published on 30.08.2023  [2023/35]
Applicant(s)For all designated states
LG Electronics Inc.
128 Yeoui-daero
Yeongdeungpo-Gu
07336 SEOUL / KR
[2020/38]
Inventor(s)01 / Oh, Minkyu
IP Center, LG Electronics Inc. 51, Gasan digital
1-ro, Geumcheon-gu
08592 Seoul / KR
 [2020/38]
Representative(s)Ter Meer Steinmeister & Partner
Patentanwälte mbB
Nymphenburger Straße 4
80335 München / DE
[2020/38]
Application number, filing date20169413.023.11.2018
[2020/38]
Priority number, dateKR2017016164129.11.2017         Original published format: KR 20170161641
[2020/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3708927
Date:16.09.2020
Language:EN
[2020/38]
Type: B1 Patent specification 
No.:EP3708927
Date:27.10.2021
Language:EN
[2021/43]
Search report(s)(Supplementary) European search report - dispatched on:EP14.08.2020
ClassificationIPC:F25B21/02, F25D11/00, F25D3/00, F25D16/00
[2020/38]
CPC:
F25D3/005 (EP,US); F25D31/005 (KR); F25B21/02 (EP,KR,US);
F25D11/003 (US); F25D11/006 (KR,US); F25D16/00 (EP,US);
F25D17/06 (KR); F25D23/065 (KR); H10N10/10 (EP,US);
F25B2321/0211 (EP,US); F25B2321/0212 (EP,US); F25B2321/023 (KR,US);
F25B2321/0251 (EP,US); F25D2317/063 (KR); F25D2317/0681 (KR);
F25D2700/121 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/38]
TitleGerman:TEMPERATURGESTEUERTER BEHÄLTER[2020/38]
English:TEMPERATURE CONTROLLED CONTAINER[2020/38]
French:CONTENEUR À TEMPÉRATURE RÉGULÉE[2020/38]
Examination procedure14.04.2020Examination requested  [2020/38]
12.03.2021Amendment by applicant (claims and/or description)
27.05.2021Communication of intention to grant the patent
21.09.2021Fee for grant paid
21.09.2021Fee for publishing/printing paid
21.09.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP18207936.8  / EP3492842
Opposition(s)28.07.2022No opposition filed within time limit [2022/40]
Fees paidRenewal fee
20.11.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.11.2018
AL27.10.2021
AT27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
CH30.06.2022
LI30.06.2022
[2023/35]
Former [2023/33]HU23.11.2018
AL27.10.2021
AT27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2023/30]AL27.10.2021
AT27.10.2021
CY27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2023/01]AL27.10.2021
AT27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SI27.10.2021
SK27.10.2021
SM27.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/49]AL27.10.2021
AT27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SK27.10.2021
SM27.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/48]AT27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SK27.10.2021
SM27.10.2021
IE23.11.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/35]AT27.10.2021
CZ27.10.2021
DK27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SK27.10.2021
SM27.10.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/34]AT27.10.2021
EE27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RO27.10.2021
RS27.10.2021
SE27.10.2021
SM27.10.2021
LU23.11.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/33]AT27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
MC27.10.2021
NL27.10.2021
PL27.10.2021
RS27.10.2021
SE27.10.2021
SM27.10.2021
BE30.11.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/25]AT27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RS27.10.2021
SE27.10.2021
BG27.01.2022
NO27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/24]AT27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
NL27.10.2021
PL27.10.2021
RS27.10.2021
SE27.10.2021
BG27.01.2022
GR28.01.2022
IS27.02.2022
PT28.02.2022
Former [2022/23]AT27.10.2021
ES27.10.2021
FI27.10.2021
HR27.10.2021
LT27.10.2021
LV27.10.2021
PL27.10.2021
RS27.10.2021
BG27.01.2022
PT28.02.2022
Former [2022/22]AT27.10.2021
FI27.10.2021
LT27.10.2021
RS27.10.2021
BG27.01.2022
Former [2022/21]AT27.10.2021
RS27.10.2021
BG27.01.2022
Former [2022/19]BG27.01.2022
Documents cited:Search[X]WO9519533  (MARLOW IND INC [US], et al) [X] 1-15 * page 23, line 1 - line 17; figure 6b *;
 [A]US2002162339  (HARRISON HOWARD R [CA], et al) [A] 1-15 * paragraph [0053] - paragraph [0064]; figure 2 *;
 [A]US2004068992  (CAUCHY CHARLES J [US]) [A] 1-15 * paragraph [0017] - paragraph [0023]; figure 2 *;
 [A]FR2853400  (LUTRINGER PHILIPPE [FR], et al) [A] 1-15 * the whole document *;
 [A]US2005086947  (MINOURA ATSUSHI [JP]) [A] 1-15 * paragraph [0018] - paragraph [0026]; figure 1 *;
 [Y]WO2006088413  (ELECTROLUX HOME PROD CORP [BE], et al) [Y] 1-15 * page 2, line 16 - page 4, line 9; figures 1-4 *;
 [A]WO2007000208  (IPV INHEIDENER PRODUKTIONS UND [DE], et al) [A] 1-15* page 10, line 28 - page 12, line 12; figures 1-3 *;
 [Y]KR20140073137  (HALLA VISTEON CLIMATE CONTROL [KR]) [Y] 1-15 * figures 2,7 *
by applicantKR200251824Y
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.