| EP3745604 - DATA IN MOTION STORAGE SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.08.2023 Database last updated on 31.03.2026 | |
| Former | The patent has been granted Status updated on 26.08.2022 | ||
| Former | Grant of patent is intended Status updated on 08.05.2022 | ||
| Former | Examination is in progress Status updated on 13.08.2021 | ||
| Former | Request for examination was made Status updated on 04.06.2021 | ||
| Former | The application has been published Status updated on 30.10.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states NKB Properties Management, LLC 80 Cuttermill Road Great Neck NY 11021 / US | [2023/07] |
| Former [2020/49] | For all designated states LYTELOOP TECHNOLOGIES, LLC 80 Cuttermill Road, Suite 309 Great Neck, NY 11021 / US | Inventor(s) | 01 /
DAMAGHI, Daniel M. Great Neck, NY 11021 / US | 02 /
HARLEV, Ohad Closter, NJ 07624 / US | 03 /
LITVIN, Ariel Great Neck, NY 11021 / US | 04 /
WILLNER, Alan Eli Los Angeles, CA 90335 / US | 05 /
BARAK, Naftaly 7 Hayasmin Street Petah-Tikva / IL | 06 /
MCMANAMON, Paul Francis Dayton, OH 45424 / US | 07 /
MCGUFFIN, Asher Lexington, MA 02420 / US | [2022/39] |
| Former [2021/27] | 01 /
DAMAGHI, Daniel M. 80 Cuttermill Road Great Neck, NY New York 11021 / US | ||
| 02 /
HARLEV, Ohad 10 Blackledge Ct. Closter, NJ New Jersey 07624 / US | |||
| 03 /
LITVIN, Ariel 80 Cuttermill Road Great Neck, NY New York 11021 / US | |||
| 04 /
WILLNER, Alan Eli 9326 Sawyer Street Los Angeles, CA California 90335 / US | |||
| 05 /
BARAK, Naftaly 7 Hayasmin Street Petah-Tikva / IL | |||
| 06 /
MCMANAMON, Paul Francis 4161 Spruce Pine Court Dayton, OH Ohio 45424 / US | |||
| 07 /
MCGUFFIN, Asher 80 Cuttermill Road Great Neck, NY New York 11021 / US | |||
| Former [2020/49] | 01 /
DAMAGHI, Daniel M. 80 Cuttermill Road Great Neck, NY New York 11021 / US | ||
| 02 /
HARLEV, Ohad 10 Heaton Court Closter, NJ New Jersey 07624 / US | |||
| 03 /
LITVIN, Ariel 80 Cuttermill Road Great Neck, NY New York 11021 / US | |||
| 04 /
WILLNER, Alan Eli 9326 Sawyer Street Los Angeles, CA California 90335 / US | |||
| 05 /
BARAK, Naftaly 7 Hayasmin Street Petah-Tikva / IL | |||
| 06 /
MCMANAMON, Paul Francis 4161 Spruce Pine Court Dayton, OH Ohio 45424 / US | |||
| 07 /
MCGUFFIN, Asher 80 Cuttermill Road Great Neck, NY New York 11021 / US | Representative(s) | Rentsch Partner AG Kirchenweg 8 Postfach 8034 Zürich / CH | [2022/39] |
| Former [2020/49] | Rentsch Partner AG Bellerivestrasse 203 Postfach 8034 Zürich / CH | Application number, filing date | 20184820.7 | 21.03.2017 | [2020/49] | Priority number, date | US201662311814P | 22.03.2016 Original published format: US 201662311814 P | [2020/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3745604 | Date: | 02.12.2020 | Language: | EN | [2020/49] | Type: | B1 Patent specification | No.: | EP3745604 | Date: | 28.09.2022 | Language: | EN | [2022/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.10.2020 | Classification | IPC: | H04B7/00, H04B7/14, H04B7/15, H04B7/185, H04B10/00, H04B10/11, H04J14/06, H04J14/04, H04J14/02, H04J14/00, H04B10/118, G02B6/28 | [2020/49] | CPC: |
H04B7/18517 (EP,IL,RU,US);
H04Q11/0003 (IL,KR,US);
H04B7/00 (IL,RU);
H04B10/118 (EP,IL,KR,US);
G02B6/2861 (EP,IL);
G02B6/2938 (IL,KR,RU,US);
G02B6/4457 (IL,KR,RU,US);
H04B10/00 (IL,RU);
H04B10/11 (IL,RU);
H04B10/503 (KR);
H04J14/005 (EP,IL,KR,US);
H04J14/02 (KR);
H04J14/04 (KR);
H04J14/06 (EP,IL,KR,US);
H04J14/07 (EP,IL,RU,US);
H04L7/0075 (IL,US);
H04B2210/003 (IL,US);
H04J2203/0098 (IL,KR,US);
H04Q2011/0016 (IL,KR,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/27] |
| Former [2020/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DATEN IN BEWEGUNGSSPEICHERUNGSSYSTEM UND -VERFAHREN | [2020/49] | English: | DATA IN MOTION STORAGE SYSTEM AND METHOD | [2020/49] | French: | SYSTÈME ET PROCÉDÉ DE MÉMORISATION DE DONNÉES EN MOUVEMENT | [2020/49] | Examination procedure | 31.05.2021 | Amendment by applicant (claims and/or description) | 31.05.2021 | Examination requested [2021/27] | 31.05.2021 | Date on which the examining division has become responsible | 17.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 16.12.2021 | Reply to a communication from the examining division | 09.05.2022 | Communication of intention to grant the patent | 17.08.2022 | Fee for grant paid | 17.08.2022 | Fee for publishing/printing paid | 17.08.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17770999.5 / EP3433939 | Opposition(s) | 29.06.2023 | No opposition filed within time limit [2023/36] | Fees paid | Renewal fee | 08.07.2020 | Renewal fee patent year 03 | 08.07.2020 | Renewal fee patent year 04 | 05.03.2021 | Renewal fee patent year 05 | 09.03.2022 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 21.03.2017 | HU | 21.03.2017 | AL | 28.09.2022 | AT | 28.09.2022 | BG | 28.09.2022 | CZ | 28.09.2022 | DK | 28.09.2022 | EE | 28.09.2022 | FI | 28.09.2022 | HR | 28.09.2022 | LT | 28.09.2022 | LV | 28.09.2022 | MC | 28.09.2022 | NL | 28.09.2022 | PL | 28.09.2022 | RO | 28.09.2022 | RS | 28.09.2022 | SE | 28.09.2022 | SI | 28.09.2022 | SK | 28.09.2022 | SM | 28.09.2022 | TR | 28.09.2022 | NO | 28.12.2022 | GR | 29.12.2022 | IS | 28.01.2023 | PT | 30.01.2023 | IE | 21.03.2023 | LU | 21.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | [2026/05] |
| Former [2025/39] | CY | 21.03.2017 | |
| HU | 21.03.2017 | ||
| AL | 28.09.2022 | ||
| AT | 28.09.2022 | ||
| BG | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| IE | 21.03.2023 | ||
| LU | 21.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2025/36] | CY | 21.03.2017 | |
| AL | 28.09.2022 | ||
| AT | 28.09.2022 | ||
| BG | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| IE | 21.03.2023 | ||
| LU | 21.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/51] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| BG | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| IE | 21.03.2023 | ||
| LU | 21.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/12] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| IE | 21.03.2023 | ||
| LU | 21.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/09] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| IE | 21.03.2023 | ||
| LU | 21.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| Former [2024/08] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| IE | 21.03.2023 | ||
| LU | 21.03.2023 | ||
| Former [2024/02] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| LU | 21.03.2023 | ||
| Former [2023/51] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SI | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| Former [2023/48] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| MC | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| Former [2023/34] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| DK | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| Former [2023/30] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| NL | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| Former [2023/29] | AL | 28.09.2022 | |
| AT | 28.09.2022 | ||
| CZ | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| Former [2023/26] | AT | 28.09.2022 | |
| CZ | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| PL | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| IS | 28.01.2023 | ||
| PT | 30.01.2023 | ||
| Former [2023/23] | AT | 28.09.2022 | |
| CZ | 28.09.2022 | ||
| EE | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SK | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| PT | 30.01.2023 | ||
| Former [2023/22] | AT | 28.09.2022 | |
| CZ | 28.09.2022 | ||
| FI | 28.09.2022 | ||
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| RO | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| PT | 30.01.2023 | ||
| Former [2023/20] | FI | 28.09.2022 | |
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| SM | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| Former [2023/10] | FI | 28.09.2022 | |
| HR | 28.09.2022 | ||
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| GR | 29.12.2022 | ||
| Former [2023/09] | FI | 28.09.2022 | |
| LT | 28.09.2022 | ||
| LV | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| NO | 28.12.2022 | ||
| Former [2023/08] | FI | 28.09.2022 | |
| LT | 28.09.2022 | ||
| RS | 28.09.2022 | ||
| SE | 28.09.2022 | ||
| NO | 28.12.2022 | Documents cited: | Search | [A] US4656666 (PIEKENBROCK LAWRENCE J et al.) | [A] EP0080841 (UNIV LELAND STANFORD JUNIOR et al.) | [AD] US5566261 (HALL KATHERINE L et al.) | by applicant | US5602838 | US6002916 | US6043918 | US7103280 | US8913894 | US2010269143 | US2010279604 | US4856862 | US4815804 | US4653042 | US5862286 | US4136929 | US7199343 | US5740117 | GB9800082 | US4479701 | US4877952 | US4469397 | US2007081785 | US4738503 | US6917739 | US6172926 | US5533154 | US5566261 | US6647163 | US5058060 | US2003007230 | US2002196488 | US4166212 | US4473270 | US8582972 | US2009202191 | US7177510 | US7110651 | US4974931 | US7103239 | DR. PAUL MCMANAMON: "Laser Radar: Progress and Opportunities in Active Electro-Optical Sensing", 2014, NATIONAL ACADEMY OF SCIENCE STUDY | PIDISHETY: "Investigation of scalability of all-fiber fused mode selective coupler for generating multiple OAM states", PROCEEDINGS OF INTERNATIONAL CONFERENCE ON FIBER OPTICS AND PHOTONICS, 2016 | MCDONALD ET AL.: "Spatial Solitary-Wave Optical Memory", JOURNAL OF THE OPTICAL SOCIETY OF AMERICA B (OPTICAL PHYSICS, vol. 7, no. 7, 1990, pages 1328 - 1335, XP000138057 | LEO ET AL.: "Temporal cavity solitons in one-dimensional Kerr media as bits in an all-optical buffer", NATURE PHOTONICS, vol. 4, 2010, pages 471 - 476, XP002716482, DOI: 10.1038/nphoton.2010.120 DOI: http://dx.doi.org/10.1038/nphoton.2010.120 | BOYD ET AL.: "Applications of Slow Light in Telecommunications", OPTICS & PHOTONICS NEWS, vol. 17, no. 4, 2006, pages 18 - 23 |