EP3855273 - A SYSTEM FOR CONTROLLING A PLURALITY OF AUTONOMOUS VEHICLES ON A MINE SITE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.05.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 02.06.2023 | ||
Former | Grant of patent is intended Status updated on 14.03.2023 | ||
Former | Examination is in progress Status updated on 10.02.2022 | ||
Former | Request for examination was made Status updated on 04.02.2022 | ||
Former | The application has been published Status updated on 25.06.2021 | Most recent event Tooltip | 18.10.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 20.11.2024 [2024/47] | Applicant(s) | For all designated states Liebherr Mining Equipment Newport News Co. 4100 Chestnut Ave Newport News VA 23607 / US | [2021/30] | Inventor(s) | 01 /
Whitfield Jr., James 4100 Chestnut Ave Newport News, VA 23607 / US | 02 /
Harper, Bryan 4100 Chestnut Ave Newport News, VA 23607 / US | [2021/30] | Representative(s) | Behr, Wolfgang Lorenz Seidler Gossel Rechtsanwälte Patentanwälte Partnerschaft mbB Widenmayerstraße 23 80538 München / DE | [2021/30] | Application number, filing date | 21153764.2 | 27.01.2021 | [2021/30] | Priority number, date | US202016773790 | 27.01.2020 Original published format: US202016773790 | [2021/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3855273 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Type: | B1 Patent specification | No.: | EP3855273 | Date: | 05.07.2023 | Language: | EN | [2023/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.05.2021 | Classification | IPC: | G05D1/02, G05D1/00, B60P1/00, E21C41/00 | [2021/30] | CPC: |
G05D1/0297 (EP);
G05D1/0027 (EP,US);
B60W60/007 (US);
E21C41/00 (EP);
E21F17/00 (US);
G05D1/0016 (US);
G05D1/0276 (US);
G05D1/0287 (US);
G05D1/223 (US);
G05D1/247 (US);
G05D1/69 (US);
G05D1/692 (US);
B60W2556/45 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/30] | Title | German: | SYSTEM ZUR STEUERUNG VON MEHREREN AUTONOMEN FAHRZEUGEN AUF EINEM MINENGELÄNDE | [2021/30] | English: | A SYSTEM FOR CONTROLLING A PLURALITY OF AUTONOMOUS VEHICLES ON A MINE SITE | [2021/30] | French: | SYSTÈME DE COMMANDE D'UNE PLURALITÉ DE VÉHICULES AUTONOMES SUR UN SITE MINIER | [2021/30] | Examination procedure | 28.01.2022 | Amendment by applicant (claims and/or description) | 28.01.2022 | Examination requested [2022/10] | 28.01.2022 | Date on which the examining division has become responsible | 09.02.2022 | Despatch of a communication from the examining division (Time limit: M04) | 07.06.2022 | Reply to a communication from the examining division | 01.07.2022 | Despatch of a communication from the examining division (Time limit: M06) | 06.12.2022 | Reply to a communication from the examining division | 15.03.2023 | Communication of intention to grant the patent | 23.05.2023 | Fee for grant paid | 23.05.2023 | Fee for publishing/printing paid | 23.05.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 08.04.2024 | No opposition filed within time limit [2024/24] | Fees paid | Renewal fee | 20.01.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 05.07.2023 | CZ | 05.07.2023 | DK | 05.07.2023 | EE | 05.07.2023 | ES | 05.07.2023 | FI | 05.07.2023 | HR | 05.07.2023 | IT | 05.07.2023 | LT | 05.07.2023 | LV | 05.07.2023 | MC | 05.07.2023 | NL | 05.07.2023 | PL | 05.07.2023 | RO | 05.07.2023 | RS | 05.07.2023 | SE | 05.07.2023 | SI | 05.07.2023 | SK | 05.07.2023 | SM | 05.07.2023 | NO | 05.10.2023 | GR | 06.10.2023 | IS | 05.11.2023 | PT | 06.11.2023 | LU | 27.01.2024 | BE | 31.01.2024 | [2024/47] |
Former [2024/43] | AT | 05.07.2023 | |
CZ | 05.07.2023 | ||
DK | 05.07.2023 | ||
EE | 05.07.2023 | ||
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
IT | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
MC | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RO | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SI | 05.07.2023 | ||
SK | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
LU | 27.01.2024 | ||
Former [2024/40] | AT | 05.07.2023 | |
CZ | 05.07.2023 | ||
DK | 05.07.2023 | ||
EE | 05.07.2023 | ||
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
IT | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
MC | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RO | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SI | 05.07.2023 | ||
SK | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/36] | AT | 05.07.2023 | |
CZ | 05.07.2023 | ||
DK | 05.07.2023 | ||
EE | 05.07.2023 | ||
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
IT | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RO | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SI | 05.07.2023 | ||
SK | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/27] | AT | 05.07.2023 | |
CZ | 05.07.2023 | ||
DK | 05.07.2023 | ||
EE | 05.07.2023 | ||
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
IT | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RO | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SK | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/23] | AT | 05.07.2023 | |
CZ | 05.07.2023 | ||
DK | 05.07.2023 | ||
EE | 05.07.2023 | ||
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RO | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SK | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/22] | AT | 05.07.2023 | |
CZ | 05.07.2023 | ||
DK | 05.07.2023 | ||
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RO | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/20] | AT | 05.07.2023 | |
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
SM | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/10] | AT | 05.07.2023 | |
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
HR | 05.07.2023 | ||
LT | 05.07.2023 | ||
LV | 05.07.2023 | ||
NL | 05.07.2023 | ||
PL | 05.07.2023 | ||
RS | 05.07.2023 | ||
SE | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
PT | 06.11.2023 | ||
Former [2024/09] | AT | 05.07.2023 | |
ES | 05.07.2023 | ||
FI | 05.07.2023 | ||
LT | 05.07.2023 | ||
NL | 05.07.2023 | ||
SE | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
IS | 05.11.2023 | ||
Former [2024/08] | LT | 05.07.2023 | |
NL | 05.07.2023 | ||
NO | 05.10.2023 | ||
GR | 06.10.2023 | ||
Former [2024/05] | NL | 05.07.2023 | Documents cited: | Search | [X]US5448479 (KEMNER CARL A [US], et al) [X] 1,6 * Column 3 lines 17-42, column 8 lines 48-52, Figure 1. *; | [XYI]US2012136507 (EVERETT BRYAN JAMES [US], et al) [X] 1,2,4-6,11 * Paragraphs [0013]-[0015], [0018]-[0021], [0023], [0025], [0039]; Figures 1-3. * [Y] 3,7,10,12,14,15 [I] 8,9,13; | [Y]EP2476034 (DEUTSCHE TELEKOM AG [DE]) [Y] 10* Paragraphs [0015]-[0016]. *; | [Y]WO2015187081 (ATLAS COPCO ROCK DRILLS AB [SE]) [Y] 3,7,12,14,15 * Page 2 lines 22-27, page 4 lines 23-26, page 17 lines 21-32, page 18 lines 1-7; Figure 2. * | Examination | US2015308270 | US2018291575 | by applicant | US2003102974 | US2017270761 |