| EP4044526 - TECHNIQUES FOR AN EFFICIENT USE OF REDUNDANT MULTIPATH SCHEDULING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.05.2025 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 20.06.2024 | ||
| Former | Grant of patent is intended Status updated on 06.05.2024 | ||
| Former | Examination is in progress Status updated on 23.03.2024 | ||
| Former | Grant of patent is intended Status updated on 05.03.2024 | ||
| Former | Examination is in progress Status updated on 15.07.2022 | Most recent event Tooltip | 23.01.2026 | Lapse of the patent in a contracting state New state(s): BE, IE | published on 25.02.2026 [2026/09] | Applicant(s) | For all designated states Deutsche Telekom AG Friedrich-Ebert-Allee 140 53113 Bonn / DE | [2022/33] | Inventor(s) | 01 /
AMEND, Markus 63667 Nidda / DE | [2022/33] | Representative(s) | Braun-Dullaeus Pannen Emmerling Patent- & Rechtsanwaltspartnerschaft mbB Platz der Ideen 2 40476 Düsseldorf / DE | [2022/33] | Application number, filing date | 21157480.1 | 16.02.2021 | [2022/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4044526 | Date: | 17.08.2022 | Language: | EN | [2022/33] | Type: | B1 Patent specification | No.: | EP4044526 | Date: | 24.07.2024 | Language: | EN | [2024/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.08.2021 | Classification | IPC: | H04W28/08, H04W36/00, H04L43/0829, H04W28/086, H04W72/542, H04L43/0852, H04L43/0864 | [2024/10] | CPC: |
H04W28/0865 (EP);
H04L43/0829 (EP);
H04L43/0858 (EP);
H04L43/0864 (EP);
H04W28/09 (EP);
H04W36/0027 (EP);
H04W72/542 (EP);
H04L43/0876 (EP);
H04L43/16 (EP);
|
| Former IPC [2022/33] | H04L12/707, H04L12/26, H04W24/04, H04W28/08, H04W72/12, H04W36/00, H04W36/38 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/33] | Title | German: | TECHNIKEN ZUR EFFIZIENTEN NUTZUNG REDUNDANTER MEHRPFADPLANUNG | [2022/33] | English: | TECHNIQUES FOR AN EFFICIENT USE OF REDUNDANT MULTIPATH SCHEDULING | [2022/33] | French: | TECHNIQUES POUR UNE UTILISATION EFFICACE DE LA PROGRAMMATION REDONDANTE À TRAJETS MULTIPLES | [2022/33] | Examination procedure | 08.02.2022 | Amendment by applicant (claims and/or description) | 08.02.2022 | Examination requested [2022/33] | 08.02.2022 | Date on which the examining division has become responsible | 12.04.2022 | Despatch of a communication from the examining division (Time limit: M04) | 22.08.2022 | Reply to a communication from the examining division | 26.10.2022 | Despatch of a communication from the examining division (Time limit: M04) | 27.02.2023 | Reply to a communication from the examining division | 13.04.2023 | Despatch of a communication from the examining division (Time limit: M04) | 22.08.2023 | Reply to a communication from the examining division | 13.09.2023 | Despatch of a communication from the examining division (Time limit: M04) | 23.01.2024 | Reply to a communication from the examining division | 06.03.2024 | Communication of intention to grant the patent | 22.03.2024 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.05.2024 | Communication of intention to grant the patent | 18.06.2024 | Fee for grant paid | 18.06.2024 | Fee for publishing/printing paid | 18.06.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 25.04.2025 | No opposition filed within time limit [2025/27] | Fees paid | Renewal fee | 15.02.2023 | Renewal fee patent year 03 | 23.02.2024 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 24.07.2024 | BG | 24.07.2024 | CZ | 24.07.2024 | DK | 24.07.2024 | EE | 24.07.2024 | ES | 24.07.2024 | FI | 24.07.2024 | HR | 24.07.2024 | IT | 24.07.2024 | LV | 24.07.2024 | MC | 24.07.2024 | NL | 24.07.2024 | PL | 24.07.2024 | RO | 24.07.2024 | SE | 24.07.2024 | SK | 24.07.2024 | SM | 24.07.2024 | NO | 24.10.2024 | RS | 24.10.2024 | GR | 25.10.2024 | IS | 24.11.2024 | PT | 25.11.2024 | IE | 16.02.2025 | LU | 16.02.2025 | BE | 28.02.2025 | CH | 28.02.2025 | [2026/09] |
| Former [2025/48] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| CZ | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| EE | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| IT | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| MC | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SE | 24.07.2024 | ||
| SK | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| LU | 16.02.2025 | ||
| CH | 28.02.2025 | ||
| Former [2025/47] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| CZ | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| EE | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| IT | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| MC | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SE | 24.07.2024 | ||
| SK | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| LU | 16.02.2025 | ||
| Former [2025/43] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| CZ | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| EE | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| IT | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| MC | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SE | 24.07.2024 | ||
| SK | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/42] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| CZ | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| EE | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| IT | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SE | 24.07.2024 | ||
| SK | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/23] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| CZ | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| EE | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| IT | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SK | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/22] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| EE | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/21] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| DK | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| RO | 24.07.2024 | ||
| SM | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/10] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| ES | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| HR | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| RS | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/09] | AT | 24.07.2024 | |
| BG | 24.07.2024 | ||
| FI | 24.07.2024 | ||
| LV | 24.07.2024 | ||
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| IS | 24.11.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/08] | FI | 24.07.2024 | |
| NL | 24.07.2024 | ||
| PL | 24.07.2024 | ||
| NO | 24.10.2024 | ||
| GR | 25.10.2024 | ||
| PT | 25.11.2024 | ||
| Former [2025/04] | NL | 24.07.2024 | |
| PT | 25.11.2024 | ||
| Former [2025/03] | PT | 25.11.2024 | Documents cited: | Search | [XY] EP2665309 (JUNIPER NETWORKS INC et al.) | [Y] US8243679 (HUANG RENXIANG et al.) | [Y] US2012315905 (ZHU JING et al.) | [Y] CATT: "Measurement in CA", 3GPP DRAFT; R2-095485, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Miyazaki; 20091012, 16 October 2009 (2009-10-16), XP050390041 | [I] KRISTIANSSON J ET AL: "Application-layer mobility support for streaming real-time media", WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE, 2004. WCNC. 2004 IE EE ATLANTA, GA, USA 21-25 MARCH 2004, PISCATAWAY, NJ, USA,IEEE, vol. 1, 21 March 2004 (2004-03-21), pages 268 - 273, XP010708081, ISBN: 978-0-7803-8344-9 | Examination | US2005059400 | by applicant | VU ANH VUBRENTON WALKER: "Proceedings of the 14th Workshop on Challenged Networks (CHANTS'19", 2019, ASSOCIATION FOR COMPUTING MACHINERY, article "Redundant Multipath-TCP Scheduling with Desired Packet Latency", pages: 7 - 12 | YIHUA ETHAN GUOASHKAN NIKRAVESHZ. MORLEY MAOFENG QIANSUBHABRATA SEN: "Proceedings of the 23rd Annual International Conference on Mobile Computing and Networking (MobiCom '17", 2017, ASSOCIATION FOR COMPUTING MACHINERY, article "Accelerating Multipath Transport Through Balanced Subflow Completion", pages: 141 - 153 | JING ZUOJIANJIAN ZHUWEI LIU, A PATH-AWARE SCHEDULING SCHEME FOR MULTIPATH TRANSPORT PROTOCOLS, March 2018 (2018-03-01) | B. FELIXI. STEUCKA. SANTOSS. SECCIM. NOGUEIRA: "Redundant Packet Scheduling by Uncorrelated Paths in Heterogeneous Wireless Networks", 2018 IEEE SYMPOSIUM ON COMPUTERS AND COMMUNICATIONS (ISCC), NATAL, 2018, pages 00498 - 00503 | ALEXANDER FROMMGENAMR RIZKTOBIAS ERBSHAUL3>ERMAX WELLERBORIS KOLDEHOFEALEJANDRO BUCHMANNRALF STEINMETZ: "Proceedings of the 18th ACM/IFIP/USENIX Middleware Conference (Middleware '17", 2017, ASSOCIATION FOR COMPUTING MACHINERY, article "A programming model for application-defined multipath TCP scheduling", pages: 134 - 146 | A. FORDC. RAICIUM. HANDLEYO. BONAVENTURE: "TCP Extensions for Multipath Operation with Multiple Addresses", RFC NO. 6824, January 2013 (2013-01-01) | J. IYENGARM. THOMSON, QUIC: A UDP-BASED MULTIPLEXED AND SECURE TRANSPORT, October 2020 (2020-10-01) | QUENTIN CONINCKOLIVIER BONAVENTURE, MULTIPATH EXTENSIONS FOR QUIC (MP-QUIC, 5 August 2020 (2020-08-05) | R. STEWART: "Stream Control Transmission Protocol", RFC NO. 4960, September 2007 (2007-09-01) | PAUL AMERMARTIN BECKETHOMAS DREIBHOLZNASIF EKIZJANA IYENGARPREETHI NATARAJANRANDALL STEWARTMICHAEL TUXEN, LOAD SHARING FOR THE STREAM CONTROL TRANSMISSION PROTOCOL (SCTP, 20 July 2020 (2020-07-20) | MARKUS AMENDANNA BRUNSTROMANDREAS KASSLERVESELIN RAKOCEVIC, DCCP EXTENSIONS FOR MULTIPATH OPERATION WITH MULTIPLE ADDRESSES, 3 November 2019 (2019-11-03) |