| EP3975224 - METHOD FOR FABRICATION OF RECESSED ELECTRICAL ELEMENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.10.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 28.10.2022 | ||
| Former | Grant of patent is intended Status updated on 28.09.2022 | ||
| Former | Request for examination was made Status updated on 15.04.2022 | ||
| Former | The application has been published Status updated on 25.02.2022 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Valstybinis Moksliniu Tyrimu Institutas Fiziniu Ir Technologijos Mokslu Centras Savanoriu pr. 231 02300 Vilnius / LT | For all designated states Institute of High Pressure Physics Polish Academy of Sciences Sokolowska 29/37 01-142 Warsaw / PL | [2022/13] | Inventor(s) | 01 /
KASALYNAS, Irmantas 10257 Vilnius / LT | 02 /
INDRISIUNAS, Simonas 10257 Vilnius / LT | 03 /
PRYSTAWKO, Pawel 01-424 Warsaw / PL | 04 /
KRUSZEWSKI, Piotr 01-424 Warsaw / PL | [2022/13] | Representative(s) | Draugeliene, Virgina Adolfina Tarpine Ltd A. P. Kavoliuko g. 24-152 04328 Vilnius / LT | [2022/13] | Application number, filing date | 21183785.1 | 05.07.2021 | [2022/13] | Priority number, date | LT20200000553 | 29.09.2020 Original published format: LT 2020553 | [2022/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3975224 | Date: | 30.03.2022 | Language: | EN | [2022/13] | Type: | B1 Patent specification | No.: | EP3975224 | Date: | 30.11.2022 | Language: | EN | [2022/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.12.2021 | Classification | IPC: | H01L21/268, H01L21/76, H01L21/8252, H01L21/285, H01L27/06, H01L29/08, B23K26/12, H01L21/335, H01L21/329, B23K26/0622, B23K26/364 | [2022/13] | CPC: |
H10W10/00 (EP);
B23K26/0624 (EP);
B23K26/1224 (EP);
B23K26/123 (EP);
B23K26/127 (EP);
B23K26/36 (EP);
B23K26/402 (EP);
H10D62/149 (EP);
H10D64/0116 (EP);
H10D64/0124 (EP);
H10D64/411 (EP);
H10D84/05 (EP);
H10D84/811 (EP);
H10P34/42 (EP);
H10W10/01 (EP);
B23K2101/40 (EP);
H10D1/20 (EP);
H10D1/47 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/19] |
| Former [2022/13] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG VON VERTIEFTEN ELEKTRISCHEN ELEMENTEN | [2022/13] | English: | METHOD FOR FABRICATION OF RECESSED ELECTRICAL ELEMENTS | [2022/13] | French: | PROCÉDÉ DE FABRICATION D'ÉLÉMENTS ÉLECTRIQUES ENCASTRÉS | [2022/13] | Examination procedure | 14.01.2022 | Amendment by applicant (claims and/or description) | 12.04.2022 | Examination requested [2022/20] | 12.04.2022 | Date on which the examining division has become responsible | 29.09.2022 | Communication of intention to grant the patent | 24.10.2022 | Fee for grant paid | 24.10.2022 | Fee for publishing/printing paid | 24.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 31.08.2023 | No opposition filed within time limit [2023/45] |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 05.07.2021 | HU | 05.07.2021 | AL | 30.11.2022 | AT | 30.11.2022 | BG | 30.11.2022 | CZ | 30.11.2022 | DK | 30.11.2022 | EE | 30.11.2022 | ES | 30.11.2022 | FI | 30.11.2022 | HR | 30.11.2022 | IT | 30.11.2022 | LT | 30.11.2022 | LV | 30.11.2022 | MC | 30.11.2022 | NL | 30.11.2022 | PL | 30.11.2022 | RO | 30.11.2022 | RS | 30.11.2022 | SE | 30.11.2022 | SI | 30.11.2022 | SK | 30.11.2022 | SM | 30.11.2022 | TR | 30.11.2022 | NO | 28.02.2023 | GR | 01.03.2023 | IS | 30.03.2023 | PT | 31.03.2023 | LU | 05.07.2023 | BE | 31.07.2023 | [2026/05] |
| Former [2025/39] | CY | 05.07.2021 | |
| HU | 05.07.2021 | ||
| AL | 30.11.2022 | ||
| AT | 30.11.2022 | ||
| BG | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| IT | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| MC | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| LU | 05.07.2023 | ||
| BE | 31.07.2023 | ||
| Former [2025/36] | CY | 05.07.2021 | |
| AL | 30.11.2022 | ||
| AT | 30.11.2022 | ||
| BG | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| IT | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| MC | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| LU | 05.07.2023 | ||
| BE | 31.07.2023 | ||
| Former [2024/51] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| BG | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| IT | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| MC | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| LU | 05.07.2023 | ||
| BE | 31.07.2023 | ||
| Former [2024/27] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| IT | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| MC | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| LU | 05.07.2023 | ||
| BE | 31.07.2023 | ||
| Former [2024/18] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| MC | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| LU | 05.07.2023 | ||
| Former [2024/14] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| MC | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/51] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SI | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/38] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SK | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/37] | AL | 30.11.2022 | |
| AT | 30.11.2022 | ||
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/35] | AT | 30.11.2022 | |
| CZ | 30.11.2022 | ||
| DK | 30.11.2022 | ||
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RO | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/34] | DK | 30.11.2022 | |
| EE | 30.11.2022 | ||
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/33] | DK | 30.11.2022 | |
| ES | 30.11.2022 | ||
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| SM | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/29] | ES | 30.11.2022 | |
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| NL | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/25] | ES | 30.11.2022 | |
| FI | 30.11.2022 | ||
| HR | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| PL | 30.11.2022 | ||
| RS | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| IS | 30.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/23] | ES | 30.11.2022 | |
| FI | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| LV | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| GR | 01.03.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/22] | ES | 30.11.2022 | |
| FI | 30.11.2022 | ||
| LT | 30.11.2022 | ||
| SE | 30.11.2022 | ||
| NO | 28.02.2023 | ||
| PT | 31.03.2023 | ||
| Former [2023/20] | LT | 30.11.2022 | |
| NO | 28.02.2023 | Documents cited: | Search | [AD] US7432142 (SAXLER ADAM WILLIAM et al.) | [AD] DE102013201298 (FRAUNHOFER GES FORSCHUNG et al.) | [A] US2016225889 (UMENO KAZUYUKI et al.) | by applicant | DE102013201298 | US7432142 | US10388753 |