blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4196999

EP4196999 - NUCLEAR FUEL ASSEMBLY WITH MULTI-PITCH WIRE WRAP [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  19.05.2023
Database last updated on 19.10.2024
FormerThe international publication has been made
Status updated on  25.02.2022
Formerunknown
Status updated on  05.04.2021
Most recent event   Tooltip20.03.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
TerraPower LLC
15800 Northup Way
Bellevue, Washington 98008 / US
[2023/25]
Inventor(s)01 / JOHNSON, Brian C.
Bellevue, Washington 98008 / US
 [2023/25]
Representative(s)D Young & Co LLP
3 Noble Street
London EC2V 7BQ / GB
[N/P]
Former [2023/25]D Young & Co LLP
120 Holborn
London EC1N 2DY / GB
Application number, filing date21714563.004.03.2021
[2023/25]
WO2021US20958
Priority number, dateUS202063066778P17.08.2020         Original published format: US 202063066778 P
US20211716004727.01.2021         Original published format: US202117160047
[2023/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2022039785
Date:24.02.2022
Language:EN
[2022/08]
Type: A1 Application with search report 
No.:EP4196999
Date:21.06.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 24.02.2022 takes the place of the publication of the European patent application.
[2023/25]
Search report(s)International search report - published on:EP24.02.2022
ClassificationIPC:G21C3/08, G21C3/338
[2023/25]
CPC:
G21C13/00 (EP); G21C13/093 (EP,KR,US); E04H5/02 (KR,US);
E04B1/167 (KR,US); G21C13/028 (KR,US); G21C13/087 (EP,KR);
G21C13/10 (EP,KR,US); G21C15/18 (KR,US); G21C21/02 (KR,US);
G21C3/08 (EP,KR); G21C3/16 (KR,US); G21C3/322 (KR,US);
G21C3/328 (KR,US); G21C3/338 (EP,KR); G21C3/3432 (KR,US);
G21C21/00 (EP); Y02E30/00 (EP); Y02E30/30 (EP,KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/25]
TitleGerman:KERNBRENNSTABBÜNDEL MIT MEHRNICKIGER DRAHTUMWICKLUNG[2023/25]
English:NUCLEAR FUEL ASSEMBLY WITH MULTI-PITCH WIRE WRAP[2023/25]
French:ASSEMBLAGE DE COMBUSTIBLE NUCLÉAIRE AVEC ENROULEMENT DE CONNEXION À PAS MULTIPLES[2023/25]
Entry into regional phase01.12.2022National basic fee paid 
01.12.2022Designation fee(s) paid 
01.12.2022Examination fee paid 
Examination procedure01.12.2022Examination requested  [2023/25]
01.12.2022Date on which the examining division has become responsible
22.09.2023Amendment by applicant (claims and/or description)
Fees paidRenewal fee
21.03.2023Renewal fee patent year 03
20.03.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI]GB1419072  (ATOMIC ENERGY AUTHORITY UK)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.