Extract from the Register of European Patents

EP About this file: EP2959300

EP2959300 - SENSOR WITH ELECTROSTATIC PENDULAR ACCELEROMETER AND METHOD OF CONTROLLING SUCH A SENSOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.02.2018
Database last updated on 07.04.2026
FormerThe patent has been granted
Status updated on  03.03.2017
FormerGrant of patent is intended
Status updated on  24.01.2017
FormerRequest for examination was made
Status updated on  11.01.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Safran Electronics & Defense
18/20 quai du Point du Jour
92100 Boulogne-Billancourt / FR
[2016/38]
Former [2016/01]For all designated states
SAGEM Défense Sécurité
18-20, Quai du Point du Jour
92100 Boulogne Billancourt / FR
Inventor(s)01 / BRISSON, Raphaël
c/o SAFRAN ELECTRONICS & DEFENSE
18-20 Quai du Point du Jour
92100 Boulogne-Billancourt / FR
02 / RAGOT, Vincent
c/o SAFRAN ELECTRONICS & DEFENSE
18-20 Quai du Point du Jour
92100 Boulogne-Billancourt / FR
 [2017/14]
Former [2016/01]01 / BRISSON, Raphaël
SAGEM DEFENSE SECURITE
18-20 Quai du Point du Jour
F-92100 Boulogne Billancourt / FR
02 / RAGOT, Vincent
SAGEM DEFENSE SECURITE
18-20 Quai du Point du Jour
F-92100 Boulogne Billancourt / FR
Representative(s)Lavialle, Bruno François Stéphane, et al
Cabinet Boettcher
5 rue de Vienne
75008 Paris / FR
[N/P]
Former [2016/01]Lavialle, Bruno François Stéphane, et al
Cabinet Boettcher
16, rue Médéric
75017 Paris / FR
Application number, filing date14704327.711.02.2014
[2016/01]
WO2014EP52652
Priority number, dateFR2013000036119.02.2013         Original published format: FR 1300361
[2016/01]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2014128027
Date:28.08.2014
Language:FR
[2014/35]
Type: A1 Application with search report 
No.:EP2959300
Date:30.12.2015
Language:FR
The application published by WIPO in one of the EPO official languages on 28.08.2014 takes the place of the publication of the European patent application.
[2015/53]
Type: B1 Patent specification 
No.:EP2959300
Date:05.04.2017
Language:FR
[2017/14]
Search report(s)International search report - published on:EP28.08.2014
ClassificationIPC:G01P15/13, G01P15/08
[2016/01]
CPC:
G01P15/131 (EP,RU,US); G01P15/125 (US); G01P15/0802 (US);
G01P15/18 (US); G01P2015/0828 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/01]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SENSOR MIT EINEM ELEKTROSTATISCHEN PENDELARTIGEN BESCHLEUNIGUNGSMESSER UND VERFAHREN ZUR STEUERUNG SOLCH EINES SENSORS[2016/01]
English:SENSOR WITH ELECTROSTATIC PENDULAR ACCELEROMETER AND METHOD OF CONTROLLING SUCH A SENSOR[2016/01]
French:CAPTEUR A ACCÉLÉROMÈTRE PENDULAIRE ÉLECTROSTATIQUE ET PROCÉDÉ DE COMMANDE D'UN TEL CAPTEUR[2016/30]
Former [2016/01]CAPTEUR A ACCELEROMETRE PENDULAIRE ELECTROSTATIQUE ET PROCEDE DE COMMANDE D'UN TEL CAPTEUR
Entry into regional phase14.08.2015National basic fee paid 
14.08.2015Designation fee(s) paid 
14.08.2015Examination fee paid 
Examination procedure14.08.2015Examination requested  [2015/53]
28.06.2016Communication of intention to grant the patent
26.07.2016Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
05.09.2016Communication of intention to grant the patent
06.01.2017Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
06.01.2017Fee for grant paid
06.01.2017Fee for publishing/printing paid
24.01.2017Information about intention to grant a patent
24.01.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.06.2016
Opposition(s)08.01.2018No opposition filed within time limit [2018/11]
Fees paidRenewal fee
25.02.2016Renewal fee patent year 03
23.02.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.02.2014
AL05.04.2017
AT05.04.2017
CY05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MC05.04.2017
MK05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
PT05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
TR05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
[2020/34]
Former [2020/31]HU11.02.2014
AT05.04.2017
CY05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MC05.04.2017
MK05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
PT05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
TR05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2020/30]HU11.02.2014
AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MC05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
PT05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
TR05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2020/28]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MC05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
PT05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
TR05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2020/15]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MC05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
TR05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2018/44]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MC05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2018/43]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
MT05.04.2017
NL05.04.2017
PL05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2018/25]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
NL05.04.2017
PL05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SI05.04.2017
SK05.04.2017
SM05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2018/11]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
IT05.04.2017
LT05.04.2017
LV05.04.2017
NL05.04.2017
PL05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SK05.04.2017
SM05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2018/10]AT05.04.2017
CZ05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
LT05.04.2017
LV05.04.2017
NL05.04.2017
PL05.04.2017
RO05.04.2017
RS05.04.2017
SE05.04.2017
SK05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2018/09]AT05.04.2017
DK05.04.2017
EE05.04.2017
ES05.04.2017
HR05.04.2017
LT05.04.2017
LV05.04.2017
NL05.04.2017
PL05.04.2017
RS05.04.2017
SE05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2017/50]AT05.04.2017
ES05.04.2017
HR05.04.2017
LT05.04.2017
LV05.04.2017
NL05.04.2017
PL05.04.2017
RS05.04.2017
SE05.04.2017
BG05.07.2017
GR06.07.2017
IS05.08.2017
Former [2017/49]AT05.04.2017
ES05.04.2017
HR05.04.2017
LT05.04.2017
NL05.04.2017
GR06.07.2017
IS05.08.2017
Former [2017/48]NL05.04.2017
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.