| EP2959300 - SENSOR WITH ELECTROSTATIC PENDULAR ACCELEROMETER AND METHOD OF CONTROLLING SUCH A SENSOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.02.2018 Database last updated on 07.04.2026 | |
| Former | The patent has been granted Status updated on 03.03.2017 | ||
| Former | Grant of patent is intended Status updated on 24.01.2017 | ||
| Former | Request for examination was made Status updated on 11.01.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Safran Electronics & Defense 18/20 quai du Point du Jour 92100 Boulogne-Billancourt / FR | [2016/38] |
| Former [2016/01] | For all designated states SAGEM Défense Sécurité 18-20, Quai du Point du Jour 92100 Boulogne Billancourt / FR | Inventor(s) | 01 /
BRISSON, Raphaël c/o SAFRAN ELECTRONICS & DEFENSE 18-20 Quai du Point du Jour 92100 Boulogne-Billancourt / FR | 02 /
RAGOT, Vincent c/o SAFRAN ELECTRONICS & DEFENSE 18-20 Quai du Point du Jour 92100 Boulogne-Billancourt / FR | [2017/14] |
| Former [2016/01] | 01 /
BRISSON, Raphaël SAGEM DEFENSE SECURITE 18-20 Quai du Point du Jour F-92100 Boulogne Billancourt / FR | ||
| 02 /
RAGOT, Vincent SAGEM DEFENSE SECURITE 18-20 Quai du Point du Jour F-92100 Boulogne Billancourt / FR | Representative(s) | Lavialle, Bruno François Stéphane, et al Cabinet Boettcher 5 rue de Vienne 75008 Paris / FR | [N/P] |
| Former [2016/01] | Lavialle, Bruno François Stéphane, et al Cabinet Boettcher 16, rue Médéric 75017 Paris / FR | Application number, filing date | 14704327.7 | 11.02.2014 | [2016/01] | WO2014EP52652 | Priority number, date | FR20130000361 | 19.02.2013 Original published format: FR 1300361 | [2016/01] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014128027 | Date: | 28.08.2014 | Language: | FR | [2014/35] | Type: | A1 Application with search report | No.: | EP2959300 | Date: | 30.12.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 28.08.2014 takes the place of the publication of the European patent application. | [2015/53] | Type: | B1 Patent specification | No.: | EP2959300 | Date: | 05.04.2017 | Language: | FR | [2017/14] | Search report(s) | International search report - published on: | EP | 28.08.2014 | Classification | IPC: | G01P15/13, G01P15/08 | [2016/01] | CPC: |
G01P15/131 (EP,RU,US);
G01P15/125 (US);
G01P15/0802 (US);
G01P15/18 (US);
G01P2015/0828 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SENSOR MIT EINEM ELEKTROSTATISCHEN PENDELARTIGEN BESCHLEUNIGUNGSMESSER UND VERFAHREN ZUR STEUERUNG SOLCH EINES SENSORS | [2016/01] | English: | SENSOR WITH ELECTROSTATIC PENDULAR ACCELEROMETER AND METHOD OF CONTROLLING SUCH A SENSOR | [2016/01] | French: | CAPTEUR A ACCÉLÉROMÈTRE PENDULAIRE ÉLECTROSTATIQUE ET PROCÉDÉ DE COMMANDE D'UN TEL CAPTEUR | [2016/30] |
| Former [2016/01] | CAPTEUR A ACCELEROMETRE PENDULAIRE ELECTROSTATIQUE ET PROCEDE DE COMMANDE D'UN TEL CAPTEUR | Entry into regional phase | 14.08.2015 | National basic fee paid | 14.08.2015 | Designation fee(s) paid | 14.08.2015 | Examination fee paid | Examination procedure | 14.08.2015 | Examination requested [2015/53] | 28.06.2016 | Communication of intention to grant the patent | 26.07.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 05.09.2016 | Communication of intention to grant the patent | 06.01.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.01.2017 | Fee for grant paid | 06.01.2017 | Fee for publishing/printing paid | 24.01.2017 | Information about intention to grant a patent | 24.01.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.06.2016 | Opposition(s) | 08.01.2018 | No opposition filed within time limit [2018/11] | Fees paid | Renewal fee | 25.02.2016 | Renewal fee patent year 03 | 23.02.2017 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.02.2014 | AL | 05.04.2017 | AT | 05.04.2017 | CY | 05.04.2017 | CZ | 05.04.2017 | DK | 05.04.2017 | EE | 05.04.2017 | ES | 05.04.2017 | HR | 05.04.2017 | IT | 05.04.2017 | LT | 05.04.2017 | LV | 05.04.2017 | MC | 05.04.2017 | MK | 05.04.2017 | MT | 05.04.2017 | NL | 05.04.2017 | PL | 05.04.2017 | PT | 05.04.2017 | RO | 05.04.2017 | RS | 05.04.2017 | SE | 05.04.2017 | SI | 05.04.2017 | SK | 05.04.2017 | SM | 05.04.2017 | TR | 05.04.2017 | BG | 05.07.2017 | GR | 06.07.2017 | IS | 05.08.2017 | [2020/34] |
| Former [2020/31] | HU | 11.02.2014 | |
| AT | 05.04.2017 | ||
| CY | 05.04.2017 | ||
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| MC | 05.04.2017 | ||
| MK | 05.04.2017 | ||
| MT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| PT | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| TR | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2020/30] | HU | 11.02.2014 | |
| AT | 05.04.2017 | ||
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| MC | 05.04.2017 | ||
| MT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| PT | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| TR | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2020/28] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| MC | 05.04.2017 | ||
| MT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| PT | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| TR | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2020/15] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| MC | 05.04.2017 | ||
| MT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| TR | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2018/44] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| MC | 05.04.2017 | ||
| MT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2018/43] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| MT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2018/25] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SI | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2018/11] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| IT | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| SM | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2018/10] | AT | 05.04.2017 | |
| CZ | 05.04.2017 | ||
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RO | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| SK | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2018/09] | AT | 05.04.2017 | |
| DK | 05.04.2017 | ||
| EE | 05.04.2017 | ||
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2017/50] | AT | 05.04.2017 | |
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| LV | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| PL | 05.04.2017 | ||
| RS | 05.04.2017 | ||
| SE | 05.04.2017 | ||
| BG | 05.07.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2017/49] | AT | 05.04.2017 | |
| ES | 05.04.2017 | ||
| HR | 05.04.2017 | ||
| LT | 05.04.2017 | ||
| NL | 05.04.2017 | ||
| GR | 06.07.2017 | ||
| IS | 05.08.2017 | ||
| Former [2017/48] | NL | 05.04.2017 | |