blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

Latvia joins the Federated Register
Click here for more information on the Federated Register.

2025-04-16

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3799607

EP3799607 - A JOINTLESS CONCRETE COMPOSITE PAVEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 26.04.2025
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  24.01.2022
FormerRequest for examination was made
Status updated on  05.03.2021
FormerThe international publication has been made
Status updated on  12.02.2021
Formerunknown
Status updated on  30.09.2020
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024  [2024/44]
Applicant(s)For all designated states
Primeteh, AS
Gustava Zemgala gatve 76
1039 Riga / LV
[2021/14]
Inventor(s)01 / CEPURITIS, Rolands
Gustava Zemgala gatve 78-14
1039 Riga / LV
02 / OSLEJS, Janis
Baznicas iela 39A-5
1010 Riga / LV
03 / PEASE, Bradley Justin
256 Tamarack Rd.
North Vancouver, BC, V7N 1S4 / CA
04 / ZEGELIS, Aldis
Briezu gatve 7-12
4050 Vilkene Vilkenes pag. Limbazu nov. / LV
05 / KAMARS, Janis
'Likteni'
2164 Adazi, Adazu nov. / LV
 [2022/23]
Former [2022/12]01 / CEPURITIS, Rolands
Gustava Zemgala gatve 78-14
1039 Riga / LV
02 / OSLEJS, Janis
Baznicas iela 39A-5
1010 Riga / LV
03 / PEASE, Bradley Justin
Damgaardsvej 20
2990 Niverod, Niva / LV
04 / ZEGELIS, Aldis
Briezu gatve 7-12
4050 Vilkene Vilkenes pag. Limbazu nov. / LV
05 / KAMARS, Janis
'Likteni'
2164 Adazi, Adazu nov. / LV
Former [2021/27]01 / CEPURITIS, Rolands
Gustava Zemgala gatve 78-14
1039 Riga / LV
02 / OSLEJS, Janis
Baznicas iela 39A-5
1010 Riga / LV
03 / PEASE, Bradley Justin
Damgaardsvej 20
2990 Niverod Niva / LV
04 / ZEGELIS, Aldis
Briezu gatve 7-12
4050 Vilkene Vilkenes pag. Limbazu nov. / LV
05 / KAMARS, Janis
'Likteni'
2164 Adazi Adazu nov. / LV
Representative(s)Fortuna, Jevgenijs
Foral Patent Law Offices
Kaleju iela 14-7
1050 Riga / LV
[N/P]
Former [2021/14]Fortuna, Jevgenijs
Foral Patent Law Office
Kaleju iela 14-7
1050 Riga / LV
Application number, filing date20775734.514.09.2020
[2021/14]
WO2020LV50004
Priority number, dateLV2019000006219.11.2019         Original published format: LV 190062
[2021/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021025548
Date:11.02.2021
Language:EN
[2021/06]
Type: A1 Application with search report 
No.:EP3799607
Date:07.04.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 11.02.2021 takes the place of the publication of the European patent application.
[2021/14]
Type: B1 Patent specification 
No.:EP3799607
Date:23.03.2022
Language:EN
[2022/12]
Search report(s)International search report - published on:EP11.02.2021
ClassificationIPC:E01C11/12, E01C7/12, E01C7/14
[2021/14]
CPC:
E01C7/12 (EP,IL,US); E01C7/142 (US); C04B16/0633 (US);
C04B28/04 (US); C04B28/065 (US); C04B28/08 (US);
E01C11/22 (IL); E01C7/14 (EP,IL); E01C7/30 (US);
C04B2111/0075 (US); Y02W30/91 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/14]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STRASSENBELAG AUS FUGENLOSEM BETONVERBUND[2021/14]
English:A JOINTLESS CONCRETE COMPOSITE PAVEMENT[2021/14]
French:CHAUSSÉE COMPOSITE EN BÉTON SANS JOINT[2021/14]
Entry into regional phase29.12.2020National basic fee paid 
29.12.2020Designation fee(s) paid 
29.12.2020Examination fee paid 
Examination procedure29.12.2020Examination requested  [2021/14]
29.12.2020Date on which the examining division has become responsible
25.03.2021Amendment by applicant (claims and/or description)
25.01.2022Communication of intention to grant the patent
09.02.2022Fee for grant paid
09.02.2022Fee for publishing/printing paid
09.02.2022Receipt of the translation of the claim(s)
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL23.03.2022
CY23.03.2022
HR23.03.2022
MC23.03.2022
MK23.03.2022
MT23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
TR23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
LU14.09.2022
[2024/44]
Former [2024/29]AL23.03.2022
CY23.03.2022
HR23.03.2022
MC23.03.2022
MK23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
TR23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
LU14.09.2022
Former [2024/27]AL23.03.2022
CY23.03.2022
HR23.03.2022
MC23.03.2022
MK23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
LU14.09.2022
Former [2024/21]AL23.03.2022
CY23.03.2022
HR23.03.2022
MC23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
LU14.09.2022
Former [2023/30]AL23.03.2022
HR23.03.2022
MC23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
LU14.09.2022
Former [2023/22]AL23.03.2022
HR23.03.2022
MC23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
Former [2023/01]AL23.03.2022
HR23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
Former [2022/51]HR23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
IS23.07.2022
Former [2022/49]HR23.03.2022
RS23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
Former [2022/47]HR23.03.2022
RS23.03.2022
SM23.03.2022
BG23.06.2022
GR24.06.2022
Former [2022/37]HR23.03.2022
RS23.03.2022
BG23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
RS23.03.2022
BG23.06.2022
Cited inInternational search[A]CN2730921Y  (SUN XUEGAO [CN]) [A] 1-12 * page 3, paragraph 1 * * page 3, paragraph last - page 5, paragraph last * * figures 1,2 *;
 [A]DE102005054235  (FITR GES FUER INNOVATION IM TI [DE], et al) [A] 1-12 * paragraphs [0001] , [0003] , [0004] , [0012] - [0035] ** claims 1,5,10 *;
 [A]JP2017133255  (TAIHEIYO CEMENT CORP, et al) [A] 1-12 * paragraphs [0001] , [0005] - [0038] * * figures 1,2; tables 1-3 *
by applicantCN2730921Y
 DE102005054235
 JP2017133255
    - "Guide for Construction of Concrete Pavements", ACI, 325.9R-15, American Concrete Institute Committee, (20150000), vol. 325, page 62
    - "Guide for Design of Jointed Concrete Pavements for Streets and Local Roads", ACI, 325.12R-02, American Concrete Institute Committee, (20020000), vol. 325, page 32
    - "Guide for the Design and Construction of Concrete Parking Lots", ACI, 330R-08, American Concrete Institute Committee, (20080000), vol. 330, page 36
    - "Report on Pervious Concrete", ACI, 522R-10, American Concrete Institute Committee, (20100000), vol. 522, page 40
    - "Guide to Roller-Compacted Concrete Pavements", ACI, 327R-14, American Concrete Institute Committee, (20150000), vol. 327, page 51
    - NATIONAL CONCRETE PAVEMENT TECHNOLOGY CENTER, Guide to Concrete Overlay Solutions, (20070000), page 29
    - THE CONCRETE SOCIETY, Technical Report 34 - Concrete Industrial Ground Floors - A Guide to Design and Construction, (20160000), page 104
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.